# Finite element analysis of progressive collapse resistance of a prefabricated RC frame structure with stud connection considering chloride corrosion

**Authors:** Zhiyuan Gao, Jiaolei Zhang

PMC · DOI: 10.1371/journal.pone.0333741 · PLOS One · 2025-11-20

## TL;DR

This study evaluates how well prefabricated concrete buildings with steel connections resist collapse over time, especially when affected by corrosion.

## Contribution

The study introduces a new model for simulating prefabricated concrete structures and evaluates their collapse resistance under corrosion effects.

## Key findings

- Interior column removal caused a 72.2% increase in displacement in PRCS compared to CPCS.
- Corrosion reduced the progressive collapse capacity of PRCS, emphasizing the need for durability in design.
- PRCS showed lower beam and catenary mechanism capacities when columns were removed.

## Abstract

To evaluate and ensure the safety of a prefabricated connection scheme for future engineering applications, this study investigates the life-cycle progressive collapse resistance of prefabricated reinforced concrete frame structures (PRCS) with steel tube stud connections. A simplified prefabricated column model was developed in SAP2000 using multi-segment linear plastic connection elements, and a six-story PRCS was established for analysis. Progressive collapse behavior of the PRCS and a comparable cast-in-place concrete frame structure (CPCS) was evaluated through the column removal method under four scenarios: corner column, long-side middle column, short-side middle column, and interior column removal. Time-history responses of internal forces and displacements were obtained. In addition, the effect of chloride-induced corrosion on the collapse performance of the structure was analyzed through pushdown analyses. The results indicate that the proposed connection model accurately reproduces the behavior of prefabricated column joints. Among the four scenarios, interior column removal had the most severe effect on PRCS, with displacement increasing by 72.2% compared to CPCS. Pushdown analysis revealed that PRCS exhibited 25.4% lower beam mechanism capacity when the corner column was removed, and 33.1% lower catenary mechanism capacity when the interior column was removed. Furthermore, long-term corrosion significantly reduced the progressive collapse capacity, underscoring the necessity of considering durability effects in design.

## Linked entities

- **Chemicals:** chloride (PubChem CID 312)

## Full-text entities

- **Chemicals:** chloride (MESH:D002712)

## Full text

_Full body text omitted from this summary view._ Fetch the complete paper as Markdown: https://tomesphere.com/paper/PMC12633900/full.md

## Figures

17 figures with captions in the complete paper: https://tomesphere.com/paper/PMC12633900/full.md

## References

40 references — full list in the complete paper: https://tomesphere.com/paper/PMC12633900/full.md

---
Source: https://tomesphere.com/paper/PMC12633900