# Research on optimization of C4 repair operation of Harmony electric locomotive based on preventive maintenance

**Authors:** Yihan Liu, Jieping Wu, Qiaoyu Wu

PMC · DOI: 10.1371/journal.pone.0328399 · PLOS One · 2025-07-24

## TL;DR

This paper improves the maintenance of electric locomotives by using a preventive approach, reducing costs and increasing availability.

## Contribution

A novel multi-component maintenance plan optimization model using a genetic algorithm for locomotive C4 repair.

## Key findings

- Preventive maintenance reduced total costs by 51.04% compared to traditional methods.
- Availability increased by 7.89% over the same operating cycle.
- The method saves costs and reduces maintenance downtime while ensuring safety.

## Abstract

Harmonious High-Power AC Electric Locomotive, as the main type of locomotive for freight transport in China, the safety of its operation and maintenance issues have been the focus of great attention by the operation department. How to reduce the high maintenance cost and shorten the time-consuming long maintenance is a pressing issue for the operation management. In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. On this basis, component-specific maintenance schedules were developed based on reliability thresholds. The results of the study showed that the preventive maintenance approach resulted in a 51.04% reduction in total cost and a 7.89% increase in availability over the same operating cycle compared to the traditional fixed repair schedule maintenance program. Under the premise of ensuring locomotive operational safety, it effectively saves costs, reduces maintenance downtime and achieves the objective of improving the quality of C4 repairs.

## Full-text entities

- **Diseases:** pain (MESH:D010146), AD (MESH:D000544), Locomotive Depot (MESH:D020233)
- **Mutations:** N

## Full text

_Full body text omitted from this summary view._ Fetch the complete paper as Markdown: https://tomesphere.com/paper/PMC12289093/full.md

## Figures

9 figures with captions in the complete paper: https://tomesphere.com/paper/PMC12289093/full.md

## References

19 references — full list in the complete paper: https://tomesphere.com/paper/PMC12289093/full.md

---
Source: https://tomesphere.com/paper/PMC12289093