PMC · DOI:10.1038/s41598-025-98324-1·April 28, 2025
Author Correction: Digital twin-driven strategic demolition plan for circular asset management of bridge infrastructures
Sakdirat Kaewunruen, Connor O’Neill, Pasakorn Sengsri

Abstract
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsBIM and Construction Integration
Full text
Correction to: Scientific Reports 10.1038/s41598-025-94117-8, published online March 2025
The original version of this Article contained an error in the spelling of the author Connor O’Neill
which was incorrectly given as Connor O’Nell.
The original Article has been corrected.
