PMC · DOI:10.1038/s41598-024-62919-x·May 31, 2024
Author Correction: Research on the method of determining the block size for an open-pit mine integrating mining parameters and shovel-truck’s operation efficiency
Weiqiang Guo, Guangwei Liu, Jiaming Li, Senlin Chai, Shupeng Guo

Abstract
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsMining Techniques and Economics · Industrial Engineering and Technologies · Belt Conveyor Systems Engineering
