# Biological feasibility of discharge a local WTTP sludge to sewer network and centralized WWTP; a case study: Tehran, Iran

**Authors:** Samira Karami, Mahdi Farzadkia, Majid Kermani, Roshanak Rezaei Kalantary, Hasan Pasalari

PMC · DOI: 10.1038/s41598-024-58821-1 · Scientific Reports · 2024-04-23

## TL;DR

This study explores the feasibility of transferring sludge from a local wastewater treatment plant in Tehran to a centralized plant, finding that a 15% sludge-to-sewage ratio prevents harmful gas emissions.

## Contribution

The study introduces a practical solution for sludge management by combining lime stabilization with sludge transfer to a centralized plant.

## Key findings

- A 15% sludge-to-raw sewage ratio prevents H2S emissions during 7 hours of transport.
- Lime stabilization at 0.6 g/g TS allows sludge loading up to 30% without H2S production.
- Transferring sludge to a centralized plant is a feasible and sustainable sludge management approach.

## Abstract

Over the recent years, ever-increasing population growth and higher wastewater production has been a challenge for decentralized wastewater treatment plants (WWTPs). In addition, sludge treatment due to high cost for equipment and place make authorities to find a sustainable approach in both of economical and technical perspectives. One of the proposed solutions is transferring the sludge produced from decentralized WWTP to centralized WWTP. However, the appropriate proportional ratio of raw sludge to raw sewage is a challenge, otherwise, it make anaerobic conditions and sewage rotting along the sewer network based on permissible limit of dihydrogen sulfide (H2S) gas (5 ppm). In the present study, seven reactors with different ratios of sludge to raw sewage (0, 15, 20, 25, 50, 75, 100) were used to stimulate the feasibility of transferring Shahrake Gharb WWTP sludge along the wastewater transfer pipe to the centralized sewage treatment south Tehran WWTP plant in Tehran, Iran. The septic situation and H2S emission of different reactors within 7 h (Time to reach the compound in the south treatment plant) was analyzed by gas meter. The results indicated that the optimum ratio of sludge to raw sewage was 15% without H2S production during 7 h. In addition, due to the high volume of sludge produced by the Shahrake Gharb WWTP, the optimal ratio of lime to total solids (TS) in sludge (gr/gr) (0.6) increased the sludge loading rate from 15 to 30% without any H2S emission during the stimulation study period. Therefore, the lime stabilization and transfer of sludge from a decentralized WWTP to a centralized WWTP is a feasible way to manage the sludge and enhance the treatment capacity in local WWTP.

## Linked entities

- **Chemicals:** dihydrogen sulfide (PubChem CID 402), H2S (PubChem CID 402), lime (PubChem CID 14778)

## Full-text entities

- **Chemicals:** TS (-), H2S (MESH:D006862), lime (MESH:C016538)

## Full text

_Full body text omitted from this summary view._ Fetch the complete paper as Markdown: https://tomesphere.com/paper/PMC11039672/full.md

## Figures

4 figures with captions in the complete paper: https://tomesphere.com/paper/PMC11039672/full.md

## References

24 references — full list in the complete paper: https://tomesphere.com/paper/PMC11039672/full.md

---
Source: https://tomesphere.com/paper/PMC11039672