Scheduling Coflows with Dependency Graph
Mehrnoosh Shafiee, Javad Ghaderi

TL;DR
None
Contribution
None
Abstract
Applications in data-parallel computing typically consist of multiple stages. In each stage, a set of intermediate parallel data flows (Coflow) is produced and transferred between servers to enable starting of next stage. While there has been much research on scheduling isolated coflows, the dependency between coflows in multi-stage jobs has been largely ignored. In this paper, we consider scheduling coflows of multi-stage jobs represented by general DAGs (Directed Acyclic Graphs) in a shared data center network, so as to minimize the total weighted completion time of jobs. This problem is significantly more challenging than the traditional coflow scheduling, as scheduling even a single multi-stage job to minimize its completion time is shown to be NP-hard. In this paper, we propose a polynomial-time algorithm with approximation ratio of , where is…
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
