Automatic Model Building in GEFCom 2017 Qualifying Match
J\'an Dolinsk\'y, M\'aria Starovsk\'a, Robert T\'oth

TL;DR
This paper presents an automatic model building approach for time series forecasting, successfully applied in GEFCom 2017, demonstrating that automated decisions on trend variables can achieve competitive results.
Contribution
It introduces the Tangent Information Modeller (TIM), an automated modeling strategy that includes trend decision automation, outperforming manual methods in a forecasting competition.
Findings
TIM with temperature shuffling won GEFCom 2017
Automated trend decision by TIM also achieved winning results
The approach demonstrates effective automation in time series modeling
Abstract
The Tangent Works team participated in GEFCom 2017 to test its automatic model building strategy for time series known as Tangent Information Modeller (TIM). Model building using TIM combined with historical temperature shuffling resulted in winning the competition. This strategy involved one remaining degree of freedom, a decision on using a trend variable. This paper describes our modelling efforts in the competition, and furthermore outlines a fully automated scenario where the decision on using the trend variable is handled by TIM. The results show that such a setup would also win the competition.
| Approach | R1 | R2 | R3 | R4 | R5 | R6 | Mean | Rank |
| Submitted | 14.55 | 18.92 | 9.30 | 9.86 | 9.74 | 14.92 | 12.88 | 1 |
| With trend | 14.55 | 18.92 | 18.92 | 3.28 | 3.16 | 14.92 | 12.29 | 1 |
| No trend | -7.20 | -7.08 | -7.08 | 9.96 | 9.84 | -17.14 | -3.12 | 11 |
| Ensemble | 6.94 | 9.30 | 9.30 | 9.86 | 9.74 | 3.47 | 8.17 | 5 |
| R 1 | R 2 | R 3 | |||||||
| TIM | Bench | Score | TIM | Bench | Score | TIM | Bench | Score | |
| CT | 99.46 | 114.88 | 13.42 | 86.59 | 115.72 | 25.17 | 86.59 | 115.72 | 25.17 |
| ME | 24.83 | 36.95 | 32.79 | 22.91 | 29.11 | 21.30 | 22.91 | 29.11 | 21.30 |
| NH | 38.86 | 41.91 | 7.29 | 34.32 | 35.34 | 2.88 | 34.32 | 35.34 | 2.88 |
| RI | 19.86 | 23.32 | 14.85 | 17.03 | 24.18 | 29.56 | 17.03 | 24.18 | 29.56 |
| VT | 19.34 | 22.44 | 13.80 | 14.9 | 15.49 | 3.81 | 14.9 | 15.49 | 3.81 |
| WCMASS | 44.44 | 50.58 | 12.14 | 46.34 | 60.32 | 23.18 | 46.34 | 60.32 | 23.18 |
| SEMASS | 40.71 | 44.11 | 7.72 | 40.95 | 50.69 | 19.22 | 40.95 | 50.69 | 19.22 |
| NEMASSBOST | 66.22 | 77.85 | 14.94 | 62.95 | 81.02 | 22.30 | 62.95 | 81.02 | 22.30 |
| MASS | 148.36 | 170.2 | 12.83 | 149.88 | 190.36 | 21.26 | 149.88 | 190.36 | 21.26 |
| TOTAL | 339.43 | 402.68 | 15.71 | 313.02 | 401.51 | 22.04 | 313.02 | 401.51 | 22.04 |
| R 4 | R 5 | R 6 | |||||||
| TIM | Bench | Score | TIM | Bench | Score | TIM | Bench | Score | |
| CT | 100.48 | 98.91 | -1.59 | 100.48 | 98.8 | -1.70 | 53.69 | 55.11 | 2.58 |
| ME | 26.49 | 23.96 | -10.58 | 26.49 | 23.88 | -10.95 | 16 | 29.71 | 46.15 |
| NH | 27.54 | 29.43 | 6.42 | 27.54 | 29.64 | 7.08 | 17.75 | 16.74 | -6.01 |
| RI | 21.31 | 21.54 | 1.08 | 21.31 | 21.53 | 1.04 | 10.7 | 11.19 | 4.39 |
| VT | 16.19 | 21.07 | 23.17 | 16.19 | 20.92 | 22.62 | 11.84 | 17.23 | 31.27 |
| WCMASS | 54.92 | 55.43 | 0.92 | 54.92 | 55.25 | 0.60 | 30.86 | 34.91 | 11.59 |
| SEMASS | 46.32 | 49.62 | 6.66 | 46.32 | 49.51 | 6.45 | 28.61 | 34.19 | 16.32 |
| NEMASSBOST | 72.18 | 73.32 | 1.56 | 72.18 | 73.16 | 1.35 | 38.37 | 44.41 | 13.60 |
| MASS | 170.68 | 175.86 | 2.94 | 170.68 | 175.86 | 2.94 | 86.75 | 106.5 | 18.55 |
| TOTAL | 344.05 | 351.89 | 2.23 | 344.05 | 351.7 | 2.17 | 180.98 | 202.83 | 10.77 |
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsEnergy Load and Power Forecasting · Grey System Theory Applications · Reservoir Engineering and Simulation Methods
Automatic Model Building in GEFCom 2017 Qualifying Match
Ján Dolinský
Mária Starovská
Robert Tóth
Tangent Works, Na Slavíne 1, Bratislava, Slovakia
Tangent Works, Oplombeekstraat 6, 1755 Gooik, Belgium
Abstract
The Tangent Works team participated in GEFCom 2017 to test its automatic model building strategy for time series known as Tangent Information Modeller (TIM). Model building using TIM combined with historical temperature shuffling resulted in winning the competition. This strategy involved one remaining degree of freedom, a decision on using a trend variable. This paper describes our modelling efforts in the competition, and furthermore outlines a fully automated scenario where the decision on using the trend variable is handled by TIM. The results show that such a setup would also win the competition.
keywords:
, GEFCom 2017 , Tangent Information Modeller , TIM , automatic model building , electricity load forecasting
††journal: ArXiv.org
1 Qualifying Match Description
Data
The qualifying match consisted of making quantile predictions for 10 different time series of electricity load sampled hourly (the 8 ISO New England zones, Massachusetts (sum of three zones under Massachusetts) and the total (sum of the first 8 zones); see Table 2 for a ful list). Fig. 1 shows an example of a load signal and coresponding quantile forecasts for January 2017. Explanatory variable candidates were restricted to four - dry bulb temperature, dew point temperature, public holidays in the United States and time information (time stamps for calculating month of year, day of week etc.). Each forecast consisted of nine deciles (from first to ninth) and was submitted 6 times:
Round 1 due date: Dec 15, 2016; forecast period: Jan 1-31, 2017.
- 2.
Round 2 due date: Dec 31, 2016; forecast period: Feb 1-28, 2017.
- 3.
Round 3 due date: Jan 15, 2017; forecast period: Feb 1-28, 2017.
- 4.
Round 4 due date: Jan 31, 2017; forecast period: Mar 1-31, 2017.
- 5.
Round 5 due date: Feb 14, 2017; forecast period: Mar 1-31, 2017.
- 6.
Round 6 due date: Feb 28, 2017; forecast period: Apr 1-30, 2017.
Historical values were available for the year 2003 up to 2016. There were no temperatures specified for the total Massachusetts load, so we used 6 temperatures (2 temperatures from each of the 3 Massachusetts zones).
Preprocessing
The data quality was good and there was no preprocessing needed on the loads nor on the temperatures. A slight change was done only to standardize the hours at the beginning and end of daylight saving time (DST). The switch to DST in March required the averaging of the hour ending at 1AM and at 3AM so that a value of load ending at 2AM is created. In November, the return to Standard Time is handled by halving the double counted 2AM value. These modifications were not needed for the data since 2016. This way we obtained 9 datasets with 4 variables (a vector of date strings, the 2 temperatures, and a vector with ones for holidays and zeros otherwise) and 1 dataset (Massachusetts) with 8 variables. Each dataset had 24 samples for each day in the years 2003 to 2016.
Strategy
The task was defined as a probabilistic forecast. We, however, decided not to use any of the modelling techniques created to handle these types of forecast such as quantile regression [1] or quantile regression forests. Instead, we followed a strategy proposed in [2]:
For each dataset, create an underlying model that would score a high accuracy provided that the exact values for temperatures would be known for each hour. 2. 2.
Shuffle historical temperatures to create ’new’ artificial possible weather scenarios for forecast months and plug them into these underlying models to obtain different load forecasts. Create quantiles from these forecasts.
2 Shuffling Temperatures
Luckily there were enough years of history available for both dry bulb and dew point temperature - from 2004 to 2016, 13 years in total (temperature from 2003 was not complete). This means we did not have to use discontinuous shuffling to obtain a sufficient amount of new temperatures. What we did is to simply shift the existing 13 year temperature profiles by 3 days ahead and 3 days behind. This way we could generate 91 (7 times 13) ’new’ temperatures, which is enough to make reasonable quantiles from load after plugging the temperature into the underlying model. These were simply constructed using the R function quantile, which calculates them as
[TABLE]
where all parameters are default taken.
3 Model Building
For each dataset only 2 models were created. These models did not interfered with models created for other time series. The procedure of creating the two models was identical in all 10 cases, meaning it suffices to describe only one of them.
Training Data Ranges
Models were trained only on the last three years (1.1.2014 to 30.11.2016). We retrained these models every time new data were available by simply adding them to the dataset. In rounds 1, 2 and 3 data were available until 30.11.2016, in rounds 4 and 5 until 31.12.2016 and in round 6 until 1.31.2017. The choice to omit older data was made mainly based on our empirical experience of modelling electricity load - too little data would not be enough to create a stable model and too much data would blur the model with outdated information (the dynamics of electricity load consumption is likely to change over years).
Trend Variable
The only difference between the 2 mentioned models is that one uses a trend variable in addition to the original ones. This is defined as follows: a value of 1 for the year 2003, value of 2 for 2004, … and value of 15 for 2017. The usefulness of such a variable was, in some of the target variables, obvious to the naked eye.
Automatic Model Building
The model itself was built using a technique we call Tangent Information Modeller (TIM). This is a technique where a huge amount of different transformations is created from the original variables to capture different nonlinear dependencies and then their number is reduced via an efficient subset selection algorithm. Transformations such as day of the week, month, moving averages, Fourier expansions, interactions etc. are all created by searching through the big parameter spaces and selecting only the most significant from them. Fig. 2 depicts this schema. The resulting model is then a model linear in parameters but nonlinear in its expressions. Each model building effort therefore optimizes both, the model structure and its corresponding parameters. Different measures to avoid over-fitting are also taken, mainly recent results from Information Criteria and Bayesian Statistics [3]. This whole process is fast and automatic, requiring no fine-tuning. Some other efforts concerning automation in time series modelling are outlined in [4, 5, 6].
For all time series, TIM generated an individual model for each hour of a day. For the sake of simplicity we refer to this set of models as a model.
Two sets of quantiles were generated for each model - ’trend’ and ’non-trend’ ones. In the 1st, 2nd and 6th round we sent only quantiles from the model containing a trend and in the 3rd, 4th and 5th round we averaged the quantiles of both models resulting in an ensemble approach. This decision was taken because after getting partial results from the first rounds we thought we could improve our performance by weakening the ’trend effect’ (and vice versa in the last round). The whole strategy is visualized in the Fig. 3.
4 Results
The pinball loss function was used to evaluate the models. Let be the target quantile, the real value and the quantile forecast, then , the pinball loss function, can be written as:
[TABLE]
For each zone in each round, the pinball loss function was calculated. These were then compared to the vanilla bench-mark model and relative improvement over the model was calculated and used as score. The final score for each round is the relative improvement over the vanilla model averaged across the all zones.
Table 1 compares 3 different strategies, the trend model, the non-trend model and their ensemble. The results submitted to the competition are in bold font. The model with the trend variable was used in rounds 1, 2 and 6. The ensemble of the trend and the non-trend models was then used in rounds 3, 4 and 5. The results show that having the trend variable was crucial for winning first place in the competition. However, in March (rounds 4 and 5) we would have been better off without it.
5 Discussion
Automation and Trend Variable
It was interesting to observe that using models with the trend variable in all rounds would have also resulted in winning the competition. This can be attributed to the fact that TIM has the ability to automatically exclude or significantly suppress variables that may worsen the prediction quality. We could therefore add the trend variable to all of the 10 scenarios and let TIM include or exclude the variable. A closer inspection of the generated models revealed that in one of the zones the trend variable was completely excluded while it varied in importance in some others. The whole competition could have been won in an automatic fashion because both, the underlying models and the quantiles were estimated without any tuning.
Table 2 gives more detailed results concerning the performance of TIM with the trend variable. These results show that our strategy consistently outperforms the Vanilla model with very few exceptions. We credit this to usage of individual underlying model structures for each of the time series. The Vanilla model, contrastingly, is a fixed structure where only its parameters are estimated from data. The results suggest that a data-driven individual model structure is perhaps a key to successful automated modelling.
Responsiveness to New Data
It is worth mentioning that our quantile forecasts would differ only slightly with the new training data available. This is due to the fact that shuffled temperatures plugged into the model will not change as they are all historical values. It was therefore perfectly possible to send quantile forecasts for the entire year 2017 right at the beginning of the competition. The only thing that may change is an underlying model, but the strategy should be robust enough that compared to the 3 years used for training, some small amount of additional training data should not make a substantial difference.
Moreover, consider a situation where the temperature in half of January gets unusually high resulting in a lowered electricity consumption. This would suggest that the temperature in the other half of January might be high too and therefore we should lower our quantiles for consumption as well. However, this represents only a small portion of training data in our underlying model and does not affect temperatures plugged into it at all, resulting in our model not being able to capture the situation very well. The question is how to adjust the strategy so models can react to new data faster without loosing generality.
Usage of Hierarchical Information
Another space for an improvement could be the “Massachusetts-total” dataset and “Total” dataset. These electricity loads are in reality a sum of 3 zonal Massachusetts loads and the sum of all loads, respectively. We completely ignored this connection and built a separate model for each. The only thing that takes this into account is usage of more temperatures for the Massachusetts-total. There certainly exists a way to improve results using some sort of hierarchical modelling, for example as in [7].
Quantile Estimation Techniques
Estimating quantiles directly using, e.g., quantile regression as in [1] is also an interesting topic for further work.
6 Conclusion
This study shows that designing a highly competitive automatic model building strategy is possible. Full automation brings some interesting benefits. It is worth emphasizing that a business user with a limited mathematical background could use TIM in an automatic fashion and obtain the same results. A robust modelling strategy with zero degrees of freedom is also key to forecasting at scale in machine-to-machine scenarios where hundreds or thousands of different time series need to be predicted. TIM is a crucial building block to such a large-scale forecasting system.
Detecting long-term trends in the historical data is possible and could be considered as future work. An additional rule for a long-term trend detection is devised and added to TIM.
In addition, the applications of TIM are not limited to electricity load forecasting. At the time of writing, TIM has been extensively tested on several hundreds of data sets from diverse domains of the energy industry (electricity load, gas consumption, wind and solar production, district cooling, etc.).
References
- [1]
P. Gaillard, Y. Goude, R. Nedellec, Additive models and robust aggregation for gefcom2014 probabilistic electric load and electricity price forecasting, International Journal of Forecasting 32 (3) (2016) 1038–1050.
doi:https://doi.org/10.1016/j.ijforecast.2015.12.001.
- [2]
J. Xie, T. Hong, Temperature scenario generation for probabilistic load forecasting, IEEE Transactions on Smart Grid PP (99) (2016) 1–1.
- [3]
S. Konishi, G. Kitagawa, Information Criteria and Statistical Modeling, Springer Science+Business Media, LLC, Tokyo, Japan, 2008, Ch. Bayesian Information Criteria, pp. 211–236.
- [4]
F. Ziel, B. Liu, Lasso estimation for gefcom2014 probabilistic electric load forecasting, International Journal of Forecasting 32 (3) (2016) 1029–1037.
doi:https://doi.org/10.1016/S0169-2070(01)00110-8.
- [5]
R. J. Hyndman, Y. Khandakar, Automatic time series forecasting: The forecast package for r, Journal of Statistical Software 27 (3).
- [6]
R. J. Hyndman, A. B. Koehler, R. D. Snyder, S. Grose, A state space framework for automatic forecasting using exponential smoothing methods, International Journal of Forecasting 18 (3) (2002) 439–454.
doi:https://doi.org/10.1016/S0169-2070(01)00110-8.
- [7]
R. J. Hyndman, R. A. Ahmed, G. Athanasopoulos, H. L. Shang, Optimal combination forecasts for hierarchical time series, Computational Statistics and Data Analysis 55 (9) (2011) 2579–2589.
The reference list from the paper itself. Each links out to its DOI / PubMed record.
- 1[1] P. Gaillard, Y. Goude, R. Nedellec, Additive models and robust aggregation for gefcom 2014 probabilistic electric load and electricity price forecasting, International Journal of Forecasting 32 (3) (2016) 1038–1050. doi:https://doi.org/10.1016/j.ijforecast.2015.12.001 . · doi ↗
- 2[2] J. Xie, T. Hong, Temperature scenario generation for probabilistic load forecasting, IEEE Transactions on Smart Grid PP (99) (2016) 1–1. doi:10.1109/TSG.2016.2597178 . · doi ↗
- 3[3] S. Konishi, G. Kitagawa, Information Criteria and Statistical Modeling, Springer Science+Business Media, LLC, Tokyo, Japan, 2008, Ch. Bayesian Information Criteria, pp. 211–236.
- 4[4] F. Ziel, B. Liu, Lasso estimation for gefcom 2014 probabilistic electric load forecasting, International Journal of Forecasting 32 (3) (2016) 1029–1037. doi:https://doi.org/10.1016/S 0169-2070(01)00110-8 . · doi ↗
- 5[5] R. J. Hyndman, Y. Khandakar, Automatic time series forecasting: The forecast package for r, Journal of Statistical Software 27 (3). doi:10.18637/jss.v 027.i 03 . · doi ↗
- 6[6] R. J. Hyndman, A. B. Koehler, R. D. Snyder, S. Grose, A state space framework for automatic forecasting using exponential smoothing methods, International Journal of Forecasting 18 (3) (2002) 439–454. doi:https://doi.org/10.1016/S 0169-2070(01)00110-8 . · doi ↗
- 7[7] R. J. Hyndman, R. A. Ahmed, G. Athanasopoulos, H. L. Shang, Optimal combination forecasts for hierarchical time series, Computational Statistics and Data Analysis 55 (9) (2011) 2579–2589. doi:https://doi.org/10.1016/j.csda.2011.03.006 . · doi ↗
