The No-Boundary Proposal as a Path Integral with Robin Boundary Conditions
Alice Di Tucci, Jean-Luc Lehners

TL;DR
This paper demonstrates that using Robin boundary conditions in gravitational path integrals with a positive cosmological constant yields stable, convergent solutions that align with the Hartle-Hawking proposal, resolving previous instability issues.
Contribution
It introduces a novel approach with Robin boundary conditions to stabilize the gravitational path integral in the no-boundary proposal, avoiding zero-size initial geometries.
Findings
Path integrals with Robin boundary conditions are convergent.
Stable Hartle-Hawking saddle points are obtained.
Initial geometries do not start at zero size.
Abstract
Realising the no-boundary proposal of Hartle and Hawking as a consistent gravitational path integral has been a long-standing puzzle. In particular, it was demonstrated by Feldbrugge et al. that the sum over all universes starting from zero size results in an unstable saddle point geometry. Here we show that in the context of gravity with a positive cosmological constant, path integrals with a specific family of Robin boundary conditions overcome this problem. These path integrals are manifestly convergent and are approximated by stable Hartle-Hawking saddle point geometries. The price to pay is that the off-shell geometries do not start at zero size. The Robin boundary conditions may be interpreted as an initial state with Euclidean momentum, with the quantum uncertainty shared between initial size and momentum.
Click any figure to enlarge with its caption.
Figure 1
Figure 2
Figure 3Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Realising the no-boundary proposal of Hartle and Hawking as a consistent gravitational path integral has been a long-standing puzzle. In particular, it was demonstrated by Feldbrugge et al. that the sum over all universes starting from zero size results in an unstable saddle point geometry. Here we show that in the context of gravity with a positive cosmological constant, path integrals with a specific family of Robin boundary conditions overcome this problem. These path integrals are manifestly convergent and are approximated by stable Hartle-Hawking saddle point geometries. The price to pay is that the off-shell geometries do not start at zero size. The Robin boundary conditions may be interpreted as an initial state with Euclidean momentum, with the quantum uncertainty shared between initial size and momentum.
The No-Boundary Proposal as a Path Integral with Robin Boundary Conditions
Alice Di Tucci
Max–Planck–Institute for Gravitational Physics (Albert–Einstein–Institute), 14476 Potsdam, Germany
Jean-Luc Lehners
Max–Planck–Institute for Gravitational Physics (Albert–Einstein–Institute), 14476 Potsdam, Germany
If quantum theory is universal, and there currently is no reason to think otherwise, then the universe should be describable by a quantum state just like any other system. While its quantum properties might be hidden today they may well have played a crucial role in an early phase of its evolution. An intriguing idea in this context is that a finite universe might have made its appearance out of nothing due to something akin of a quantum tunnelling effect. In fact this idea has a long history dating back all the way to Lemaître Lemaitre:1931zzb . Quantum cosmology should then be able to describe such a process. The most concrete formulations of this idea go under the names of “no boundary proposal” HH and “tunnelling proposal” Vilenkin:1982de . The path integral formulation of these proposals has recently been analysed in the context of Lorentzian quantum cosmology FLT1 ; FLT2 ; FLT3 ; DL ; Lehners:2018eeo . There, a transition amplitude from a geometry of zero size, i.e. from “nothing”, to a finite one was evaluated. It was shown that the two proposals are in fact identical in this formulation and that the path integral gives a result analogous to the tunnelling amplitude described in Vilenkin:1982de . Perturbations around the background geometry however turn out to be unstable, meaning that larger and larger deviations from homogeneity and isotropy are favoured quantum mechanically. This led to the conclusion that neither the no boundary nor the tunnelling proposal can be appropriate descriptions of the initial conditions of our universe.
In follow-up works different implementations of the proposals were proposed in order to avoid this negative conclusion. One attempt by Diaz-Dorronsoro et al. was to consider intrinsically complex contours of integration for the lapse function DiazDorronsoro:2017hti , also in conjunction with a specification of the initial momentum DiazDorronsoro:2018wro . However, these modifications either still included unstable perturbations FLT3 or led to inconsistencies FLT4 . Another approach by Vilenkin and Yamada (in the context of the tunnelling proposal) was to modify the boundary conditions for the perturbations to be of Robin type VY1 ; VY2 . A final proposition by Halliwell, Hartle and Hertog was to simply abandon the path integral, and concentrate on solutions of the Wheeler-DeWitt equation with desirable properties Halliwell:2018ejl (see also deAlwis:2018sec ). However, the path integral neatly captures quantum interference, and focussing on solutions that cannot be described via a path integral may thus not correctly reproduce central quantum effects.
In this Letter, we will combine several of the ideas mentioned above, using Robin boundary conditions in order to impose a condition on a linear combination of the initial size and momentum of the universe. For a family of such conditions, we find that the path integral can be approximated solely by the stable no-boundary saddle points, thus avoiding instabilities and representing a consistent definition of the no-boundary proposal.
But first, it seems appropriate to briefly review the negative result that we are trying to overcome. We will work in minisuperspace, where the geometries considered are of the form Halliwell:1988ik with a three sphere of volume . The function is the squared scale factor, while is the lapse function. The propagator for the no boundary proposal describes a transition from a spatial 3-geometry of zero size, , to a later one of size . The propagator can be evaluated as a path integral over 4-geometries with a weighting given by the Einstein-Hilbert action with a cosmological constant . The steps needed to define the gravitational path integral can be found in teitelboim ; halliwell , with final result (in constant lapse gauge )
[TABLE]
where the action takes the form (with )
[TABLE]
The integration domain for the lapse is ensuring that the geometries in the sum have a Lorentzian signature. This makes the path integral a propagator in the sense that it solves the inhomogeneous Wheleer-DeWitt equation where is the quantum Hamiltonian.
It has been shown in FLT1 that the result of the various integrations to leading order in is
[TABLE]
where we assumed that . The negative weighting is characteristic of the tunnelling proposal Vilenkin:1982de , whereas the conjectured no-boundary result is HH
[TABLE]
The difference between the two proposals may be elucidated by considering the saddle points of the full path integral (1). There are four saddle points, with geometries given by with the lapse taking the values for . Their action is
[TABLE]
From this expression we see that the propagator (2) is given by the contribution of the saddle point with and in the upper right quadrant of the complex plane. It is in fact possible to show, applying Picard-Lefschetz theory, that the integral along the positive real line is equivalent to the integral along the steepest descent path (“thimble”) running through this saddle point alone, see Fig. 1. This saddle point is however unstable FLT2 ; Halliwell:1989dy . Thus the result (2), though mathematically correct, cannot describe our universe on physical grounds.
The no-boundary result (3) instead would have been obtained by considering the contribution of the two saddle points in the lower half complex plane, with , and , . There is however no convergent contour which can be deformed into a steepest descent path running through solely these two saddle points FLT3 . In this sense, the wavefunction (3) is not the saddle point approximation of the no boundary wavefunction for any Lorentzian path integral with these boundary conditions. With different boundary conditions, the situation may change, as we will now discuss.
Let us consider augmenting the action with a Robin boundary term at the initial surface,
[TABLE]
The variation of the full action is now
[TABLE]
Thus we can see that the variational principle is well defined if we impose and
[TABLE]
In other words we fix the field value at to be corresponding to a Dirichlet boundary condition, while at we impose a condition on the linear combination of and . With these boundary conditions, the solution of the equation of motion reads
[TABLE]
Plugging this solution back into the action we find that the saddle points are
[TABLE]
A crucial requirement in order to obtain an implementation of the no-boundary idea is that at the saddle point, the geometry should be of Hawking type, and in particular it should start at zero size. From (4) one can see that the initial size vanishes at one (or more) of the saddle points if or . For , this occurs at the “tunnelling” saddle points and These are however unstable, so that in the following we will consider (we will discuss the meaning of momentarily). This gives for
[TABLE]
which are precisely the Hartle-Hawking saddle points. The other two saddle points are now located at
[TABLE]
and their initial size is . Therefore requiring that at least one of the saddle point geometries starts out at zero size corresponds to a specific value of but leaves free. The value of in fact determines which saddle point(s) are relevant to the path integral.
For , the relevant saddle point is . In this limit the Robin boundary condition reduces to the Dirichlet boundary value . For non-zero the saddle points in the upper half plane move, and the singularity in the action, which originally resides at is also shifted to . Importantly, the lower saddle points (numbers and in Fig. 1), which correspond to the desired Hartle-Hawking geometries, stay put.
Our strategy will be to define the path integral on a thimble, for the simple reason that it is then manifestly convergent. This has the important consequence that the partial integrations over the scale factor, the lapse and any other fields that might be present, can be performed in any desired order without changing the end result (i.e. Fubini’s theorem applies). At vanishing our defining integration contour is simply the Lorentzian one, along real positive values of This can then be deformed, using Picard-Lefschetz theory, to the thimble passing through the unstable saddle point as shown in Fig. 1. As is turned on, the singularity of the integral at shifts to and thus, in order to maintain an invariant definition, we will consider as our integration contour the thimble(s) emanating from
But which value should take? Roughly speaking, the unstable saddle points remain relevant until is large enough in magnitude so that they have moved “out of the way”. For real negative this approximately means that they have to move further to the left than which marks the origin of the integration contour. But since the real part of the saddle points depends on this is non-sensical from a physical point of view, as the initial conditions would have to keep being readjusted as the universe keeps expanding! On the other hand, in the imaginary direction, the unstable point (with an original location at ) only has to move beyond the stable one at This condition is independent of the final size of the universe, and thus we will only consider imaginary . The minimal magnitude of is determined precisely by the condition that the unstable saddle point move below the stable one,
[TABLE]
For being negative imaginary and of magnitude larger than this minimal value, the Hartle-Hawking saddle point becomes the only relevant one – see Fig. 2 for an illustration. Thus we have successfully isolated the Hartle-Hawking saddle point, leading to the propagator
[TABLE]
In fact, we also have the possibility of including both thimbles emanating from passing through saddles and in Fig. 2. If we define the integration contour to run over all real values of , from minus infinity to plus infinity, the result will be the real no-boundary wavefunction (3) proposed by Hartle and Hawking. Moreover, in the latter case the wave function will satisfy the homogeneous Wheeler-DeWitt equation (cf. the appendix of Ref. FLT1 ).
The Robin boundary condition implies a relationship between the initial size and the initial momentum of the geometries summed over in the path integral. It does however not necessarily avoid the appearance of singularities, in the sense that it may be possible that some of the off-shell geometries contain a region where the size of the universe passes through zero, see Fig. 3. We would like to avoid summing over such geometries, as they are (infinitely) sensitive to the addition of higher curvature terms. This will imply an upper bound on
Thus we must analyse the locus of geometries containing a region of zero volume. We start by noting that the imaginary part of the scale factor vanishes at
[TABLE]
where we have split the lapse into real and imaginary parts as . We must then determine if the real part of the scale factor (4) may simultaneously vanish, with . There is no concise analytic expression for this function. At large magnitudes of the lapse, this singular curve quickly becomes horizontal, see Fig. 2 for a sketch. Therefore the relevant question is whether near the saddle point the thimble, which asymptotically runs off to infinity at an angle of FLT1 , can avoid crossing the singular curve. Thus at we want the angle of the thimble to be larger than the angle of the singular curve. This latter angle is given by
[TABLE]
Meanwhile, the angle is found to be
[TABLE]
where we have assumed that . The condition is then satisfied for negative imaginary with
[TABLE]
where we assumed Thus for negative imaginary with magnitude between and the path integral is well defined and contains only the Hartle-Hawking saddle point(s).
Let us now explicitly verify that the perturbations are indeed suppressed. In our model we only have gravitational wave perturbations to deal with. For a single mode with fixed polarisation, the action at quadratic order is given by (see e.g. FLT2 ; FLT3 )
[TABLE]
where denotes the magnitude of the perturbation, which has been expanded in spherical harmonics with being the principal quantum number. The extension to a sum over all modes is straightforward. The equation of motion for is thus
[TABLE]
In order to solve it, it is convenient to rewrite the scale factor as where can be read off from (4). Then we find that two linearly independent solutions for are and with
[TABLE]
and At the saddle point the parameters reduce to It is straightforward to check that this implies that the mode blows up at whereas . Thus regularity selects the mode whose action at the saddle point is given by
[TABLE]
where is the final (real) magnitude of the perturbation. The resulting amplitude describes Gaussian distributed perturbations with a scale-invariant spectrum. We conclude therefore that the model is stable against small deviations since large values of are suppressed.
More generally, we can specify Robin boundary conditions for the perturbations. The full action for the perturbations is then which leads to and
[TABLE]
Any Robin boundary condition with and arbitrary will then retain the stable mode at the saddle point, while also specifying initial conditions for the perturbations off-shell. Since we are only summing over non-singular geometries off-shell, for sufficiently small perturbation amplitudes the approximation of linear perturbation theory around the background will be justified, as the perturbations encounter no divergence anywhere. Thus, the inclusion of perturbations will leave the path integral well-defined, and stable.
As already pointed out in the case of perturbations by Vilenkin and Yamada VY1 ; VY2 , the Robin boundary condition can also be implemented as a Gaussian integral
[TABLE]
where we must include an integration over the initial scale factor Owing to the fact that has to be negative imaginary, this may then also be interpreted as an initial coherent state, albeit one with a Euclidean momentum . The presence of a Euclidean momentum not only implements the idea of closing the geometry off in Euclidean time, but it also adds a positive weighting to the associated geometries. In this way we can obtain a final result with an enhanced weighting , which in the implementation with Dirichlet boundary conditions was simply impossible FLT3 . Note that in this context takes on the role of the uncertainty in the initial size And because we have a coherent state, the uncertainty in the initial momentum is then simply its inverse,
[TABLE]
Thus we see that in order to have a well defined path integral, the uncertainty must be shared between the initial size and the initial momentum, with the uncertainty being of order the Hubble length.
In concluding, let us note that the present implementation of the no-boundary proposal effectively corresponds to a redefinition. Originally, it was formulated as a sum over compact and regular geometries HH . Here the sum is redefined to be over geometries with approximately zero initial size and approximately Euclidean initial momentum. This is just fuzzy enough to allow quantum theory to pick out a regular no-boundary geometry at the saddle point, but the uncertainty is not so large that singular geometries start contributing too.
Acknowledgments: We would like to thank Sebastian Bramberger, Job Feldbrugge and Neil Turok for numerous discussions. We gratefully acknowledge the support of the European Research Council in the form of the ERC Consolidator Grant CoG 772295 “Qosmology”.
The reference list from the paper itself. Each links out to its DOI / PubMed record.
- 1(1) G. Lemaitre, “Republication of: The beginning of the world from the point of view of quantum theory,” Nature 127 (1931) 706 . [Gen. Rel. Grav.43,2929(2011)]. · doi ↗
- 2(2) J. B. Hartle and S. W. Hawking, “Wave Function of the Universe,” Phys. Rev. D 28 (1983) 2960–2975 . [Adv. Ser. Astrophys. Cosmol.3,174(1987)]. · doi ↗
- 3(3) A. Vilenkin, “Creation of Universes from Nothing,” Phys. Lett. 117B (1982) 25–28 . · doi ↗
- 4(4) J. Feldbrugge, J.-L. Lehners, and N. Turok, “Lorentzian Quantum Cosmology,” Phys. Rev. D 95 (2017) no. 10, 103508 , ar Xiv:1703.02076 [hep-th] . · doi ↗
- 5(5) J. Feldbrugge, J.-L. Lehners, and N. Turok, “No smooth beginning for spacetime,” Phys. Rev. Lett. 119 (2017) no. 17, 171301 , ar Xiv:1705.00192 [hep-th] . · doi ↗
- 6(6) J. Feldbrugge, J.-L. Lehners, and N. Turok, “No rescue for the no boundary proposal: Pointers to the future of quantum cosmology,” Phys. Rev. D 97 (2018) no. 2, 023509 , ar Xiv:1708.05104 [hep-th] . · doi ↗
- 7(7) A. Di Tucci and J.-L. Lehners, “Unstable no-boundary fluctuations from sums over regular metrics,” Phys. Rev. D 98 (2018) no. 10, 103506 , ar Xiv:1806.07134 [gr-qc] . · doi ↗
- 8(8) J.-L. Lehners, “No smooth beginning for spacetime,” Int. J. Mod. Phys. D 28 (2018) no. 02, 1930005 . · doi ↗