Solving multi-resource allocation and location problems in disaster management through linear programming
Behrooz Bodaghi, Nadezda Sukhorukova

TL;DR
This paper introduces a linear programming approach using the simplex method to efficiently solve large-scale multi-resource allocation and location problems in disaster management, bypassing the need for complex integer programming solvers.
Contribution
It demonstrates that many disaster management problems can be exactly solved with linear programming and extends linear programming techniques to cluster analysis via k-medoids.
Findings
Large-scale disaster management problems can be solved with linear programming.
The simplex method can be used for clustering without integer solvers.
Numerical experiments validate the approach.
Abstract
In this paper we propose a new efficient linear programming based approach for multi-resource allocation and location problems in disaster management. Such problems require an integer solution and therefore, in most cases, the computations rely on integer and mixed-integer linear programming solvers. In general, these solvers can not handle large scaled problem. In this paper we demonstrate that there exists a large class of disaster management problems whose exact solutions can be obtained by applying the simplex method (linear programming). The results of numerical experiments are provided. Another important contribution of this paper is related to general cluster analysis and allocation. Namely, we demonstrate that the classical -medoid clustering method can be implemented using linear programming techniques (simplex method) without relying on integer solvers.
| Number of data points | Cost function value | Time (simple) | Time (IP) | |
|---|---|---|---|---|
| 20 | 10 | 512.3478602 | 0.297 | 0.562 |
| 20 | 5 | 311.3343592 | 0.39 | 0.391 |
| 40 | 10 | 679.4089905 | 0.063 | 0.078 |
| 40 | 5 | 425.939219 | 0.063 | 0.067 |
| 60 | 10 | 848.5919719 | 0.14 | 0.235 |
| 60 | 5 | 490.5917792 | 0.187 | 0.191 |
| 80 | 10 | 961.283263 | 0.235 | 0.359 |
| 80 | 5 | 565.3424002 | 0.25 | 0.351 |
| 100 | 10 | 1109.977437 | 0.406 | 0.594 |
| 100 | 5 | 640.0424524 | 0.438 | 0.532 |
| 120 | 10 | 1173.702679 | 0.594 | 0.797 |
| 120 | 5 | 676.7603006 | 0.64 | 0.718 |
| 140 | 10 | 1241.879626 | 0.765 | 1.078 |
| 140 | 5 | 715.5979726 | 0.86 | 1 |
| 160 | 10 | 1297.640491 | 1.016 | 1.453 |
| 160 | 5 | 770.3419758 | 1.109 | 1.36 |
| 180 | 10 | 1346.426155 | 1.328 | 1.828 |
| 180 | 5 | 801.1360661 | 1.219 | 1.765 |
| 200 | 10 | 1425.259571 | 1.687 | 2.344 |
| 200 | 5 | 860.7051955 | 1.453 | 2.438 |
| 400 | 10 | 1954.177312 | 8.844 | 11.672 |
| 400 | 5 | 1170.263786 | 7.922 | 11.172 |
| 600 | 10 | 2379.228282 | 25.609 | 32.281 |
| 600 | 5 | 1406.255502 | 20.422 | 33.812 |
| 800 | 10 | 2729.268892 | 48.281 | 104.875 |
| 800 | 5 | 1617.268652 | 43.688 | 72.808 |
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsFacility Location and Emergency Management · Vehicle Routing Optimization Methods · Optimization and Search Problems
Solving multi-resource allocation and location problems in disaster management through linear programming
Abstract
In this paper we propose a new efficient linear programming based approach for multi-resource allocation and location problems in disaster management. Such problems require an integer solution and therefore, in most cases, the computations rely on integer and mixed-integer linear programming solvers. In general, these solvers can not handle large scaled problem. In this paper we demonstrate that there exists a large class of disaster management problems whose exact solutions can be obtained by applying the simplex method (linear programming). The results of numerical experiments are provided. Another important contribution of this paper is related to general cluster analysis and allocation. Namely, we demonstrate that the classical -medoid clustering method can be implemented using linear programming techniques (simplex method) without relying on integer solvers.
B. Bodaghi, Faculty of Science, Engineering and Technology,
Swinburne University of Technology, PO Box 218, Hawthorn, Victoria,
Australia, [email protected]
N. Sukhorukova, Faculty of Science, Engineering and Technology,
Swinburne University of Technology, PO Box 218, Hawthorn, Victoria,
Australia and Centre for Informatics and Applied Optimization,
Federation University Australia, [email protected]
Keyword: linear programming, integer programming, optimisation, simplex method, disaster management, resource allocation, relief centre location
MSC codes: 90C06, 90C08, 90C11, 90C05
1 Introduction
Many disaster management approaches are based on optimisation techniques. In particular, the problems are formulated as mathematical programs and then solved using available optimisation techniques [27]. In the simplest case, problems can be formulated as linear or convex programs, while some others require more advanced techniques.
A large class of applications can be formulated as mixed-integer linear programs. In these problems, all or some of the variables are integers. This makes the corresponding optimisation problems much harder to solve. Moreover, in some cases, we can not even guaranty that an obtained solution is optimal.
One approach to solve these problems is to apply standard linear optimisation methods and then round the solution to the nearest integer. This approach is not always very precise, especially when the integer variables are binary (that is, can only take values from ). In this paper we derive a rich class mixed-integer linear problems whose optimal solution can be obtained by applying the simplex method, a powerful methods developed for classical linear programs.
There are several advantages of our approach. First of all, we can guaranty that the obtained solution is integer and optimal. Second, the simplex method is part of most linear programming packages, where mixed-integer programming solvers may not be available. Third, linear programming techniques can deal with very large problems, while the applicability of mixed-integer techniques to same size problems may not be possible.
In this paper we consider three applications taken from the field of disaster management. There are many more applications where our approach is applicable. The list of such applications is rich and goes well beyond the area of disaster management.
The paper is organised as follows. In section 2 we give an overview of disaster management problems. Then, in section 3, we formulate the most important results from the area of linear programming. In section 4 we discuss the application of the classical simplex method to integer programming problems whose constraint matrices are totally unimodular. In section 5 we formulate our main results. In section 6 we provide the results of the numerical experiments. Finally, in section 7 we provide our conclusions and discussions.
2 Disaster management
Disaster management contains five general phases, namely: prediction, warning, emergency relief, rehabilitation, and reconstruction [19]. The related activities which are conducted in these phases usually contain mitigation and preparedness, response, and recovery [12].
In emergency relief operation, resource allocation problem (RAP) is often a complex challenge due to a number of issues, such as dealing with crucial demands, time criticality, competing priorities, the extent of availabilities, and different constraints and uncertainties [26]. Emergency resources can be grouped into non-expendable and expendable resources [4, 25]. Non-expendable resources are non-consumable and renewable and might include emergency personnel and volunteers. Expendable resources are consumable and cannot be renewed in the emergency, or the recovery cost surpasses the original value of the resource (for instance, medical supplies, water, food and fuel). Failure to assign adequate resources in a timely manner has been the main cause of adverse impacts in disaster situations [23, 18, 20]. Efficient reduction of losses and fatalities in disaster-struck locations are significantly dependent on the rapid deployment of resources for emergency relief operations.
A RAP models consider assignment of resources to task from relief centres without determining the sequence or flow of resources along arcs [6]. A RAP problem in disaster management is usually formulated as a mixed-integer linear programming (MILP) problem [4, 6, 9]. Most of the methodologies in natural disaster response phase focus on developing a MILP model just for one type of the resources (or just integer linear programming, ILP, when all the variables are integers). A literature review reveals that RLP models with different kinds of resources in disaster management have been discussed quite rarely ([18, 17, 4].
In addition, in most cases it is assumed that one relief centre may supply several demand points, while every demand point can receive supplies from just one relief centre. There are two main advantages of this approach. First of all, this rule makes decision maker’s tasks easier to implement. Second, this approach may minimise the number of vehicles involved. The main disadvantage of this model is that the total costs are higher than they may be in the case when several relief centres are allowed to supply the same demand point. Later in this paper we demonstrate that the removal of this assumption leads to MILP problems that can be solved using standard linear programming tools, that are very advanced and efficient, while the obtained solution is optimal for the original MILP problem.
Furthermore, finding the location of relief centres (e.g. medical centres, distribution centres) are vital in disaster management [5]. This problem can be addressed as a facility location problem (e.g. [2]) or a clustering problem (e.g. [22, 3]). To find a solution for the location of relief centres normally a MILP model is formulated for small cases, and using several heuristics approaches for solving the larger cases. Heuristic algorithms are producing a non-optimal solution and the result of them are poor quality when benchmarked with exact approach (e.g. Linear Programming) [5].
3 Linear Programming and Transportation problem
3.1 Linear Programming
A general linear programming problem or LPP can be formulated as follows:
[TABLE]
[TABLE]
where
- •
are the decision variables;
- •
is the cost vector;
- •
function in (1) is the objective (cost) function;
- •
the set of equalities and inequalities (2)-(6) are the constraints.
Definition 3.1**.**
A vector satisfying all the constraints is called a feasible solution. The set of all feasible solutions is called the feasible set.
Definition 3.2**.**
A feasible solution that minimises the objective function is called an optimal feasible solution or just an optimal solution.
Definition 3.3**.**
A liner programming problem is called feasible if there exists at least one feasible solution. Otherwise, the problem is infeasible.
There are many efficient methods for solving linear programming problems: the simplex method, originally developed by Dantzig in 1947 [7], interior point methods [13, 21]. It has been demonstrated in 1972 by [15] that the worst-case complexity of the simplex method as formulated by Dantzig is exponential time. The worst-case complexity of interior point methods is polynomial. Despite these results, the simplex method is remarkably efficient and included in most linear programming packages.
In many practical problems it is beneficial (where it is possible) to reformulate an integer or mixed-integer linear programming problem as an LPP and solve it then using linear programming techniques. This normally involves a significant increase in the number of decision variables and/or constraints.
3.2 Transportation Problems
Transportation problems form a special class of LPPs. In most operations research textbooks, this problem is formulated in a way related to transportation. It is possible, however, to apply the same type of approach to other types of problems, including location analysis and allocation problems. An excellent overview of such problems and also more advanced models can be found in [8, 16].
Consider an example of transportation problem formulation. Goods are produced at factories (also called sources)
[TABLE]
and sold at markets (also called destinations):
[TABLE]
The supply available at source is units, the demand at destination is units and the transportation cost of one unit from to is . We have to identify which sources should supply which destinations to minimise total transportation costs.
Let be the number of units to be sent from to . Then the corresponding optimisation problem can be formulated as follows:
[TABLE]
subject to
[TABLE]
[TABLE]
It is well known that if all supplies and demands are integers, then there exists an optimal solution , which is integer. This is important for many applications where the units (for example, computers, cars, people) can not be split. In general, integer and mixed-integer programming problems are much harder to solve than linear programming problems. It is also well known that the simplex method applied to a transportation problem, terminates at an optimal solution that is also integer.
There are other types of LPPs whose optimal solutions, reached by applying the simplex method, are integers. In the next section we provide a brief description of the simplex method and identify a broad class of linear problems where an integer optimal solution can be obtained by applying standard linear programming techniques.
4 The simplex method and its application to integer problems whose constraint matrices are totally unimodular
The simplex method is a powerful linear programming algorithms. The algorithm starts at a feasible vertex of the constraint polyhedron. Then it move to an adjacent vertex, where the objective function value is at least as good as it is at the original vertex. Since the number of vertices is finite, this method will terminate in a finite number of steps. If all the vertices of the constrain polyhedron have integer coordinates, then an optimal solution (can be more than one) is integer.
Consider a system of linear inequalities
[TABLE]
where is an matrix, and . It is well-known that all possible solutions to a system of linear inequalities form a polyhedron. This polyhedron is an empty set if the system does not a solution.
A comprehensive overview on integer programming can be found in [24]. Theorem 19.3 of this book (p. 268) covers the conditions when the vertices of the feasible sets are integers and therefore an optimal solution found at a vertex is integer. In this paper, we only use conditions (i), (iii) and (iv) of the theorem (originally proved in [11] and [10]). A simplified version of this theorem, formulated for this study, is as follows.
Theorem 4.1**.**
Let be a matrix with entries . Then the following are equivalent:
matrix is totally unimodular, that is each square submatrix of has determinant [math], or ; 2. 2.
for all integral vectors , , and the polyhedron
[TABLE]
has only integral vertices; 3. 3.
each collection of columns of can be split into two parts so that the sum of the columns in one part minus the sum of the columns in the other part is a vector with entries ;
The first condition of Theorem 4.1 is usually used as a definition for totally unimodular matrices. The class of totally unimodular matrices is closed under a number of operations. We need the following ones:
- •
transposition;
- •
multiplication a row (column) by .
Also, matrix is totally unimodular if and only if matrix (where is an identity matrix of the corresponding dimension) is totally unimodular.
In the next section we formulate three types of integer problems appearing in disaster management. Then we demonstrate that the corresponding system matrices are totally unimodular and therefore their optimal solutions (reached at vertices) are integers and hence can be obtained by applying the simplex method.
5 Mathematical Modelling
5.1 Expendable resources
The problem of allocating expendable resources can be formulated as a Transportation Problems. It is enough to think about incident points as “Markets” (each market demand corresponds to the corresponding incident point demand), while the relief centres are “Factories” (each factory capacity corresponds to the processing centre capacity). The transportation costs are “processing and transportation time”.
The feasible set of this problem is as follows (without sign constraints and integer requirement):
[TABLE]
where
- •
represents the corresponding demands and supplies and therefore is integral;
- •
is the vector of decision variables;
- •
is an identity matrix of size ;
- •
;
- •
;
- •
the system matrix .
Theorem 5.1**.**
The system matrix from (11) is totally unimodular.
Proof: Consider matrix obtained from by multiplying the first columns of by . Matrix is totally modular if and only if matrix is totally unimodular.
Assign the first columns of to part I and the remaining columns to part II and assume that one or more columns may be removed from the total collection of columns. The sum of the columns in part I is an -dimensional vector whose components are [math] or . The sum of the columns in part I is an -dimensional vector whose components are [math] or . Therefore the components of are [math], or and hence, by Theorem 4.1, we conclude that matrices and are totally unimodular and all the vertices of the feasible set have integer coordinates.
We can also conclude that an optimal integer solution to this problem can be found by applying the simplex method.
5.2 Non-expendable resources
In the case of non-expendable resources, the problem can also be formulated as an integer programming problem, where some of the summation constraints from a classical transportation problem are replaced with maximisation. This problem is not a classical transportation problem, but it can be formulated as an LPP. It can be demonstrated that the applications of the simplex method also leads to an integer optimal solution.
A mixed-integer formulation for the case of non-consumable resources is as follows
[TABLE]
subject to
[TABLE]
[TABLE]
[TABLE]
[TABLE]
where are incident point demands and are relief centre capacities. A relaxation of this problem, obtained by removing the last constraint (16), can be formulated as an LPP by replacing constraints (14) with equivalent systems of linear inequalities:
[TABLE]
The feasible set of this problem can be formulated as follows (without sign constraints and integer requirement):
[TABLE]
where
- •
represents the corresponding demands and supplies and therefore is integral;
- •
is the vector of decision variables;
- •
is an identity matrix of size ;
- •
is an identity matrix of size ;
- •
the system matrix .
Theorem 5.2**.**
The system matrix from (18) is totally unimodular.
Proof: is totally unimodular if and only if matrix
[TABLE]
is totally unimodular. Matrix is totally unimodular if and only if is totally unimodular. Indeed, one can assign any collection of columns of to part I and the remaining columns to part II. The difference of the corresponding columns sums contains and as the components.
Therefore, similar to the case of expendable resources, we can reduce an integer linear programming problem to an LPP whose vertices are integral.
5.3 Relief centre location
In this application, the distance matrix between all the incident points is given. The goal is to select points in such a way that, after assigning all the remaining points to the nearest selected point (cluster centre), the total sum of distances between the points and centres is minimal. Each cluster centre is a relief centre, whose optimal location (selection among the incident points) is the objective. In this application, we assume that the demand of the incident points can be covered regardless of the allocation, since the main objective is to minimise the total distance. This kind of clustering is called -medoid, was first proposed in [14].
Assume that there are demand points in total and the distance matrix
[TABLE]
It is easy to see that this matrix is symmetric and its main diagonal consists of zeros. The goal is to select points as relief centres. The decision variables are binary:
[TABLE]
and Variable is if incident point is treated as a relief centre, otherwise, this variable is zero. Variable is if incident point was assigned to point . The corresponding optimisation problem is as follows:
[TABLE]
subject to
[TABLE]
[TABLE]
[TABLE]
[TABLE]
Constraints (21) ensure that each incident point is assigned to a single relief centre. Constraints (22) ensure that an incident point can only be assigned to an incident point if this point is also a relief centre. Finally, constraint (23) ensures that exactly points are selected as relief centres. It is clear that problem (20)-(24) is an integer programming problem and, in general, it is not easy to solve this problem.
Theorem 5.3**.**
All the vertices of the feasible set in -medoid method have integer coordinates.
Proof: The set of constraints contains equalities and inequalities (not counting sign constraints and integer requirements). Use these qualities to reduce the number of variables and obtain a simpler constraint matrix . Then the feasible set is as follows (without sign constraints and integer requirement):
[TABLE]
where
- •
contains integral numbers only (, , [math] or );
- •
is the vector of decision variables;
- •
;
- •
is an identity matrix of size ;
- •
is an identity matrix of size ;
- •
the system matrix .
Matrix contains blocks of rows ( rows in each block). Add the first blocks to the final block of rows (keeping the same order of rows in each block). By doing this, the obtained right hand side vector remains integer, while the last block of rows consists of zeros. If the problem is feasible (that is ), the final block of rows can be removed. Then the remaining system matrix is
[TABLE]
where
[TABLE]
where
[TABLE]
To complete the proof, it is enough to show that matrix is totally unimodular. Indeed, for any collection of columns in (), the columns can be split into two parts: it is enough to assign any columns (when is odd) or columns (when is even) to one of the parts and the remaining columns in the other part. Then the sum of the columns in part I minus the sum of the columns in part II contains , or [math].
Combine these results with Theorem 4.1. This completes the proof.
Therefore, it is enough to apply the simplex method to solve this problem and obtain an integer optimal solution.
Note that Theorem 5.3 is an important result, since it allows one to avoid integer solvers when applying -medoid method. This results is of interest of cluster analysis and allocation and therefore has many other potential applications.
To our best knowledge, there is no result in the literature confirming that all the vertices of the linear relaxations of -medoid formulations are integers. One relevant study [1] conducts a comprehensive numerical study on -means and -medoid, where most experimental results confirm that the relaxation produce integer (or nearly integer) results: “LP relaxation remains integral with high probability”. In the same paper, the authors talk about “generically unique solutions”, since “no constraint is parallel to the objective function ”. Our approach can deal with the problems where there are such constraints and therefore our approach is more general. Moreover, the current paper provides an analytical proof that the vertices are integral and therefore the classical implementation of the simplex method always terminates at an integer solution and hence the corresponding problems can be solved efficiently.
A comprehensive survey of modern location science [16] considers similar problems (-median). The authors suggest to solve these problems using a heuristic method. This also confirms that our result is new, since the authors of this recent and comprehensive publication are not aware about the fact that the simplex method obtains an integer solution which is optimal.
6 Numerical Experiments
To demonstrate the applicability of these RLP models, a hypothetical disaster relief problems have been solved using CPLEX Solver 12.7 on a 3.4 GHz processor with 4 GB of RAM.
The results obtained for expendable and non-expendable resource allocation were comparable for both implementations: through the simplex method (LP) and branch and bounds (ILP). Namely, the computational time and the optimal value of the cost function were almost the same. This confirms that the branch and bound method terminates after just very few branching stages.
In the case of the relief centre location experiments, the situation is different, since the corresponding optimisation problems are more complex. Table 1 contains the results of the numerical experiments. In this table we compare the computational time for the simplex method and IP implementations, the optimal cost value is the same for both implementation and therefore only one column is provided. represents the number of clusters. These results indicate that the computational time is significantly lower for the simplex method. On the top of this, the simplex method reached integer solutions in all the experiments. All these confirm that it is much more efficient to use the classical simplex method in -medoid models.
Comment 6.1**.**
It is important to note that most commercial packages implement a number of heuristic techniques in order to accelerate the simplex method. Some of these approaches lead to solutions that are not vertices of the feasible set and therefore are not necessarily integers. We have observed this results in MATLAB when datasets contain more than 100 points. CPLEX implementations of the simplex method are more stable than those implemented in MATLAB and therefore CPLEX was chosen for our numerical experiments.
7 Discussion and future research directions
In this paper we study two groups of disaster management problems: resource allocation (expendable and non-expendable) and relief centre location. We demonstrate that these problems can be formulated as integer linear programming problems, whose optimal solution can be found by applying the simplex method to the corresponding linear relaxations. There are two main advantage of this approach. Firstly, most optimisation packages include the simplex method. In particular, small-medium size linear problems can be solved with Excel, while mixed-integer solvers (for example Branch and Bound) may not be available. Secondly, our approach allows one to reduce the computational time. This is especially prominent in the case of the relief centre location problems, where the corresponding problems are binary.
-medoid method is a very popular clustering technique that is also commonly used in other application. Therefore, another important contribution of this paper is the demonstration that this problem can be solved without application of an integer solver, that is all the computations can be done by applying the classical simplex method, available in most linear packages. This result is achieved by demonstrating that the constraint matrices of the corresponding integer linear programming problems are totally unimodular.
One of our future research direction is to include capacity constraints for the relief centre location problem. Another research direction is to study a modified problem where none of the demand points can be supplied from more than one relief centre. Another future research direction is to extend the results to the case of -median problems.
Acknowledgement
This research was supported by the Australian Research Council (ARC), Solving hard Chebyshev approximation problems through nonsmooth analysis (Discovery Project DP180100602).
The reference list from the paper itself. Each links out to its DOI / PubMed record.
- 1[1] Pransal Awasthi, Afonso Bandiera, Moses Charikar, Ravishankar Krishnaswamy, Soledad Villar, and Rachel Ward. Relax, no need to round: integrity of clustering formulations, 2015.
- 2[2] B. Balcik and B. M. Beamon. Facility location in humanitarian relief. International Journal of Logistics Research and Applications , 11(2):101–121, 2008.
- 3[3] Behrooz Bodaghi. Optimisation Approaches for Scheduling Disaster Emergency Operations with Multiple Resources . Ph D thesis, Swinburne University of Technology, 2017.
- 4[4] Behrooz Bodaghi, Palaneeswaran Ekambaram, and Babak Abbasi. Bi-objective multi-resource scheduling problem for emergency relief operations. Production Planning & Control , (Articles in Press)(2018), 2018.
- 5[5] Chawis Boonmee, Mikiharu Arimura, and Takumi Asada. Facility location optimization model for emergency humanitarian logistics. International Journal of Disaster Risk Reduction , 24:485 – 498, 2017.
- 6[6] Aakil M Caunhye, Xiaofeng Nie, and Shaligram Pokharel. Optimization models in emergency logistics: A literature review. Socio-economic planning sciences , 46(1):4–13, 2012.
- 7[7] George B. Dantzig. Linear Programming and Extensions . Princeton University Press, Princeton, New Jersey, 1963.
- 8[8] Zvi Drezner and Horst W. Hamacher, editors. Facility Location: Applications and Theory . Springer, 2002.