This study reevaluates the effectiveness of unsupervised versus supervised defect prediction methods in software engineering, finding that supervised models generally perform better when analyzed on a per-project basis, but both approaches have potential.
Contribution
The paper critically examines prior claims that unsupervised defect predictors outperform supervised ones, providing a nuanced analysis that highlights variability and the importance of project-specific evaluation.
Findings
Supervised predictors generally outperform unsupervised ones on a project-by-project basis.
Variability exists in the efficacy of unsupervised predictors, requiring some supervised data for pruning.
Both approaches may be combined to achieve comparable defect prediction performance.
Abstract
Collecting quality data from software projects can be time-consuming and expensive. Hence, some researchers explore "unsupervised" approaches to quality prediction that does not require labelled data. An alternate technique is to use "supervised" approaches that learn models from project data labelled with, say, "defective" or "not-defective". Most researchers use these supervised models since, it is argued, they can exploit more knowledge of the projects. At FSE'16, Yang et al. reported startling results where unsupervised defect predictors outperformed supervised predictors for effort-aware just-in-time defect prediction. If confirmed, these results would lead to a dramatic simplification of a seemingly complex task (data mining) that is widely explored in the software engineering literature. This paper repeats and refutes those results as follows. (1) There is much variability in…
| Metric | Description |
|---|---|
| NS | Number of modified subsystems (mockus2000predicting, ). |
| ND | Number of modified directories (mockus2000predicting, ). |
| NF | Number of modified files (nagappan2006mining, ). |
| Entropy | Distribution of the modified code across each file (d2010extensive, ; hassan2009predicting, ). |
| LA | Lines of code added (nagappan2005use, ). |
| LD | Lines of code deleted (nagappan2005use, ). |
| LT | Lines of code in a file before the current change (koru2009investigation, ). |
| FIX | Whether or not the change is a defect fix (guo2010characterizing, ; yin2011fixes, ). |
| NDEV | Number of developers that changed the modified files (matsumoto2010analysis, ). |
| AGE | The average time interval between the last and the current |
| change (graves2000predicting, ). | |
| NUC | The number of unique changes to the modified files (d2010extensive, ; hassan2009predicting, ). |
| EXP | The developer experience in terms of number of changes (mockus2000predicting, ). |
| REXP | Recent developer experience (mockus2000predicting, ). |
| SEXP | Developer experience on a subsystem (mockus2000predicting, ). |
| Project | Period | Total Change | of Defects | Avg LOC per Change | # Modified Files per Change |
|---|---|---|---|---|---|
| Bugzilla | 08/1998 - 12/2006 | 4620 | 36% | 37.5 | 2.3 |
| Platform | 05/2001 - 12/2007 | 64250 | 14% | 72.2 | 4.3 |
| Mozilla | 01/2000 - 12/2006 | 98275 | 5% | 106.5 | 5.3 |
| JDT | 05/2001 - 12/2007 | 35386 | 14% | 71.4 | 4.3 |
| Columba | 11/2002 - 07/2006 | 4455 | 31% | 149.4 | 6.2 |
| PostgreSQL | 07/1996 - 05/2010 | 20431 | 25% | 101.3 | 4.5 |
| Project | EALR | LT | AGE | |||
|---|---|---|---|---|---|---|
| A | B | A | B | A | B | |
| Bugzilla | 0.59 | 0.59 | 0.72 | 0.72 | 0.67 | 0.67 |
| Platform | 0.58 | 0.58 | 0.72 | 0.72 | 0.71 | 0.71 |
| Mozilla | 0.50 | 0.50 | 0.65 | 0.65 | 0.64 | 0.64 |
| JDT | 0.59 | 0.59 | 0.71 | 0.71 | 0.68 | 0.69 |
| Columba | 0.62 | 0.62 | 0.73 | 0.73 | 0.79 | 0.79 |
| PostgreSQL | 0.60 | 0.60 | 0.74 | 0.74 | 0.73 | 0.73 |
| Average | 0.58 | 0.58 | 0.71 | 0.71 | 0.70 | 0.70 |
| Project | EALR | LT | AGE | |||
|---|---|---|---|---|---|---|
| A | B | A | B | A | B | |
| Bugzilla | 0.29 | 0.30 | 0.45 | 0.45 | 0.38 | 0.38 |
| Platform | 0.31 | 0.30 | 0.43 | 0.43 | 0.43 | 0.43 |
| Mozilla | 0.18 | 0.18 | 0.36 | 0.36 | 0.28 | 0.28 |
| JDT | 0.32 | 0.34 | 0.45 | 0.45 | 0.41 | 0.41 |
| Columba | 0.40 | 0.42 | 0.44 | 0.44 | 0.57 | 0.57 |
| PostgreSQL | 0.36 | 0.36 | 0.43 | 0.43 | 0.43 | 0.43 |
| Average | 0.31 | 0.32 | 0.43 | 0.43 | 0.41 | 0.41 |
| Project | Recall | F1 | Precision | |||||
|---|---|---|---|---|---|---|---|---|
| A (LT) | B | A (LT) | B | A (REXP) | B | A (EXP) | B | |
| Bugzilla | 0.45 | 0.36 | 0.72 | 0.65 | 0.33 | 0.35 | 0.40 | 0.39 |
| Platform | 0.43 | 0.41 | 0.72 | 0.69 | 0.16 | 0.17 | 0.14 | 0.11 |
| Mozilla | 0.36 | 0.33 | 0.65 | 0.62 | 0.10 | 0.08 | 0.06 | 0.04 |
| JDT | 0.45 | 0.42 | 0.71 | 0.70 | 0.18 | 0.18 | 0.15 | 0.12 |
| Columba | 0.44 | 0.56 | 0.73 | 0.76 | 0.23 | 0.32 | 0.24 | 0.25 |
| PostgreSQL | 0.43 | 0.44 | 0.74 | 0.74 | 0.24 | 0.29 | 0.25 | 0.23 |
| Average | 0.43 | 0.42 | 0.71 | 0.69 | 0.21 | 0.23 | 0.21 | 0.19 |
| Project | Recall | F1 | Precision | |||||
|---|---|---|---|---|---|---|---|---|
| A (EALR) | B | A (EALR) | B | A (IBk) | B | A (RF) | B | |
| Bugzilla | 0.30 | 0.36 | 0.59 | 0.65 | 0.30 | 0.35 | 0.59 | 0.39 |
| Platform | 0.30 | 0.41 | 0.58 | 0.69 | 0.23 | 0.17 | 0.38 | 0.11 |
| Mozilla | 0.18 | 0.33 | 0.50 | 0.62 | 0.18 | 0.08 | 0.27 | 0.04 |
| JDT | 0.34 | 0.42 | 0.59 | 0.70 | 0.22 | 0.18 | 0.31 | 0.12 |
| Columba | 0.42 | 0.56 | 0.62 | 0.76 | 0.24 | 0.32 | 0.50 | 0.25 |
| PostgreSQL | 0.36 | 0.44 | 0.60 | 0.74 | 0.21 | 0.29 | 0.69 | 0.23 |
| Average | 0.32 | 0.42 | 0.58 | 0.69 | 0.23 | 0.23 | 0.46 | 0.19 |
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Code & Models
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
\usetikzlibrary
shadows
Revisiting Unsupervised Learning for Defect Prediction
Wei Fu, Tim Menzies
Com. Sci., NC State, USA
[email protected], [email protected]
(2017)
Abstract.
Collecting quality data from software projects can be time-consuming and expensive. Hence, some researchers explore “unsupervised” approaches to quality prediction that does not require labelled data. An alternate technique is to use “supervised” approaches that learn models from project data labelled with, say, “defective” or “not-defective”. Most researchers use these supervised models since, it is argued, they can exploit more knowledge of the projects.
At FSE’16, Yang et al. reported startling results where unsupervised defect predictors outperformed supervised predictors for effort-aware just-in-time defect prediction. If confirmed, these results would lead to a dramatic simplification of a seemingly complex task (data mining) that is widely explored in the software engineering literature.
This paper repeats and refutes those results as follows. (1) There is much variability in the efficacy of the Yang et al. predictors so even with their approach, some supervised data is required to prune weaker predictors away. (2) Their findings were grouped across projects. When we repeat their analysis on a project-by-project basis, supervised predictors are seen to work better.
Even though this paper rejects the specific conclusions of Yang et al., we still endorse their general goal. In our our experiments, supervised predictors did not perform outstandingly better than unsupervised ones for effort-aware just-in-time defect prediction. Hence, they may indeed be some combination of unsupervised learners to achieve comparable performance to supervised ones. We therefore encourage others to work in this promising area.
Data analytics for software engineering, software repository mining, empirical studies, defect prediction
††conference: Submitted to 11th Joint Meeting of the European Software Engineering Conference and the ACM SIGSOFT Symposium on the Foundations of Software Engineering; 4–8 September, 2017; Paderborn, Germany††copyright: rightsretained††copyright: none††doi: 10.1145/3106237.3106257††isbn: 978-1-4503-5105-8/17/09††conference: 2017 11th Joint Meeting of the European Software Engineering Conference and the ACM SIGSOFT Symposium on the Foundations of Software Engineering; September 4-8, 2017; Paderborn, Germany††journalyear: 2017††price: 15.00
1. Introduction
This paper repeats and refutes recent results from Yang et al. (yang2016effort, ) published at FSE’16. The task explored by Yang et al. was effort-ware just-in-time (JIT) software defect predictors. JIT defect predictors are built on code change level and could be used to conduct defect prediction right before developers commit the current change. They report an unsupervised software quality prediction method that achieved better results than standard supervised methods. We repeated their study since, if their results were confirmed, this would imply that decades of research into defect prediction (lessmann2008benchmarking, ; hassan2009predicting, ; fu2016differential, ; fu2016tuning, ; graves2000predicting, ; menzies2007data, ; hall2012systematic, ; nagappan2005use, ; jiang2013personalized, ; kim2007predicting, ; kim2008classifying, ; jing2014dictionary, ; lee2011micro, ; moser2008comparative, ; nam2013transfer, ; wang2016automatically, ; yang2016effort, ; kamei2013large, ) had needlessly complicated an inherently simple task.
The standard method for software defect prediction is learning from labelled data. In this approach, the historical log of known defects is learned by a data miner. Note that this approach requires waiting until a historical log of defects is available; i.e. until after the code has been used for a while. Another approach, explored by Yang et al., uses general background knowledge to sort the code, then inspect the code in that sorted order. In their study, they assumed that more defects can be found faster by first looking over all the “smaller” modules (an idea initially proposed by Koru et al. (koru2009investigation, )). After exploring various methods of defining “smaller”, they report their approach finds more defects, sooner, than supervised methods. These results are highly remarkable:
- •
This approach does not require access to labelled data; i.e. it can be applied just as soon as the code is written.
- •
It is extremely simple: no data pre-processing, no data mining, just simple sorting.
Because of the remakrable nature of these results, this paper takes a second look at the Yang et al. results. We ask three questions:
RQ1: Do all unsupervised predictors perform better than supervised predictors?
The reason we ask this question is that if the answer is “yes”, then we can simply select any unsupervised predictor built from the the change metrics as Yang et al suggested without using any supervised data; if the answer is “no”, then we must apply some techniques to select best predictors and remove the worst ones. However, our results show that, when projects are explored separately, the majority of the unsupervised predictors learned by Yang et al. perform worse than supervised predictors.
Results of RQ1 suggest that after building multiple predictors using unsupervised methods, it is required to prune the worst predictors and only better ones should be used for future prediction. However, with Yang et al. approach, there is no way to tell which unsupervised predictors will perform better without access to the labels of testing data. To test that speculation, we built a new learner, OneWay, that uses supervised training data to remove all but one of the Yang et al. predictors. Using this learner, we asked:
RQ2: Is it beneficial to use supervised data to prune away all but one of the Yang et al. predictors?
Our results showed that OneWay nearly always outperforms the unsupervised predictors found by Yang et al. The success of OneWay leads to one last question:
RQ3: Does OneWay perform better than more complex standard supervised learners?
Such standard supervised learners include Random Forests, Linear Regression, J48 and IBk (these learners were selected based on prior results by (menzies2007data, ; lessmann2008benchmarking, ; kamei2013large, ; hall2012systematic, )). We find that in terms of Recall and (the metric preferred by Yang et al.), OneWay performed better than standard supervised predictors. Yet measured in terms of Precision, there was no advantage to OneWay.
From the above, we make an opposite conclusion to Yang et al.; i.e., there are clear advantages to use supervised approaches over unsupervised ones. We explain the difference between our results and their results as follows:
- •
Yang et al. reported averaged results across all projects;
- •
We offer a more detailed analysis on a project-by-project basis.
The rest of this paper is organized as follows. Section 2 is a commentary on Yang et al. study and the implication of this paper. Section 3 describes the background and related work on defect prediction. Section 4 explains the effort-ware JIT defect prediction methods investigated in this study. Section 5 describes the experimental settings of our study, including research questions that motivate our study, data sets and experimental design. Section 6 presents the results. Section 7 discusses the threats to the validity of our study. Section 8 presents the conclusion and future work.
Note one terminological convention: in the following, we treat “predictors” and “learners” as synonyms.
2. SCIENCE IN the 21st Cenury
While this paper is specific about effort-aware JIT defect prediction and the Yang et al. result, at another level this paper is also about science in the 21st century.
In 2017, the software analytics community now has the tools, data sets, experience to explore a *bold * wider range of options. There are practical problems in exploring all those possibilities specifically, too many options. For example, in section 2.5 of (kocaguneli2012exploiting, ), Kocaguneli et al. list 12,000+ different ways of estimation by analogy. We have had some recent successes with exploring this space of options (fu2016tuning, ) but only after the total space of options is reduced by some initial study to a manageable set of possibilities. Hence, what is needed are initial studies to rule our methods that are generally unpromising (e.g. this paper) before we apply second level hyper-parameter optimization study that takes the reduced set of options.
Another aspect of 21st century science that is highlighted by this paper is the nature of repeatability. While this paper disagrees the conclusions of Yang et al., it is important to stress that their paper is an excellent example of good science that should be emulated in future work.
Firstly, they tried something new. There are many papers in the SE literature about defect prediction. However, compared to most of those, the Yang et al. paper is bold and stunningly original.
Secondly, they made all their work freely available. Using the “R” code they placed online, we could reproduce their result, including all their graphical output, in a matter of days. Further, using that code as a starting point, we could rapidly conduct the extensive experimentation that leads to this paper. This is an excellent example of the value of open science.
Thirdly, while we assert their answers were wrong, the question they asked is important and should be treated as an open and urgent issue by the software analytics community. In our experiments, supervised predictors performed better than unsupervised– but not outstandingly better than unsupervised. Hence, they may indeed be some combination of unsupervised learners to achieve comparable performance to supervised. Therefore, even though we reject the specific conclusions of Yang et al., we still endorse the question they asked strongly and encourage others to work in this area.
3. Background and Related Work
3.1. Defect Prediction
As soon as people started programming, it became apparent that programming was an inherently buggy process. As recalled by Maurice Wilkes (wilkes1985memoirs, ), speaking of his programming experiences from the early 1950s: “It was on one of my journeys between the EDSAC room and the punching equipment that ‘hesitating at the angles of stairs’ the realization came over me with full force that a good part of the remainder of my life was going to be spent in finding errors in my own programs.”
It took decades to gather the experience required to quantify the size/defect relationship. In 1971, Fumio Akiyama (akiyama1971example, ) described the first known “size” law, saying the number of defects D was a function of the number of LOC where .
In 1976, Thomas McCabe argued that the number of LOC was less important than the complexity of that code (mccabe1976complexity, ). He argued that code is more likely to be defective when his “cyclomatic complexity” measure was over 10. Later work used data miners to build defect predictors that proposed thresholds on multiple measures (menzies2007data, ).
Subsequent research showed that software bugs are not distributed evenly across a system. Rather, they seem to clump in small corners of the code. For example, Hamill et al. (hamill09, ) report studies with (a) the GNU C++ compiler where half of the files were never implicated in issue reports while 10% of the files were mentioned in half of the issues. Also, Ostrand et al. (Ostrand:2004, ) studied (b) AT&T data and reported that 80% of the bugs reside in 20% of the files. Similar “80-20” results have been observed in (c) NASA systems (hamill09, ) as well as (d) open-source software (koru2009investigation, ) and (e) software from Turkey (misirli2011ai, ).
Given this skewed distribution of bugs, a cost-effective quality assurance approach is to sample across a software system, then focus on regions reporting some bugs. Software defect predictors built from data miners are one way to implement such a sampling policy. While their conclusions are never 100% correct, they can be used to suggest where to focus more expensive methods such as elaborate manual review of source code (Shull:2001, ); symbolic execution checking (paaareanu2008combining, ), etc. For example, Misirli et al. (misirli2011ai, ) report studies where the guidance offered by defect predictors:
- •
Reduced the effort required for software inspections in some Turkish software companies by 72%;
- •
While, at the same time, still being able to find the 25% of the files that contain 88% of the defects.
Not only do static code defect predictors perform well compared to manual methods, they also are competitive with certain automatic methods. A recent study at ICSE’14, Rahman et al. (rahman2014comparing, ) compared (a) static code analysis tools FindBugs, Jlint, and Pmd and (b) static code defect predictors (which they called “statistical defect prediction”) built using logistic regression. They found no significant differences in the cost-effectiveness of these approaches. Given this equivalence, it is significant to note that static code defect prediction can be quickly adapted to new languages by building lightweight parsers that extract static code metrics. The same is not true for static code analyzers– these need extensive modification before they can be used on new languages.
To build such defect predictors, we measure the complexity of software projects using McCabe metrics, Halstead’s effort metrics and CK object-oriented code mertics (kafura1987use, ; chidamber1994metrics, ; mccabe1976complexity, ; halstead1977elements, ) at a coarse granularity, like file or package level. With the collected data instances along with the corresponding labels (defective or non-defective), we can build defect prediction models using supervised learners such as Decision Tree, Random Forests, SVM, Naive Bayes and Logistic Regression (khoshgoftaar2001modeling, ; khoshgoftaar2003software, ; khoshgoftaar2000balancing, ; menzies2007data, ; lessmann2008benchmarking, ; hall2012systematic, ). After that, such trained defect predictor can be applied to predict the defects of future projects.
3.2. Just-In-Time Defect Prediction
Traditional defect prediction has some drawbacks such as prediction at a coarse granularity and started at very late stage of software development circle (kamei2013large, ), whereas in JIT defect prediction paradigm, the defect predictors are built on code change level, which could easily help developers narrow down the code for inspection and JIT defect prediction could be conducted right before developers commit the current change. JIT defect prediction becomes a more practical method for practitioners to carry out.
Mockus et al. (mockus2000predicting, ) conducted the first study to predict software failures on a telecommunication software project, 5ESS, by using logistic regression on data sets consisted of change metrics of the project. Kim et al. (kim2008classifying, ) further evaluated the effectiveness of change metrics on open source projects. In their study, they proposed to apply support vector machine to build a defect predictor based on software change metrics, where on average they achieved accuracy and recall. Since training data might not be available when building the defect predictor, Fukushima et al. (fukushima2014empirical, ) introduced cross-project paradigm into JIT defect prediction. Their results showed that using data from other projects to build JIT defect predictor is feasible.
Most of the research into defect prediction does not consider the effort111Effort means time/labor required to inspect total number of files/code predicted as defective. required to inspect the code predicted to be defective. Exceptions to this rule include the work of Arishom and Briand (Arisholm:2006, ), Koru et al. (koru2009investigation, ) and Kamei et al. (kamei2013large, ). Kamei et al. (kamei2013large, ) conducted a large-scale study on the effectiveness of JIT defect prediction, where they claimed that using of efforts required to inspect all changes, their modified linear regression model (EALR) could detect defect-introducing changes. Inspired by Menzies et al.’s ManualUp model (i.e., small size of modules inspected first) (menzies2010defect, ), Yang et al. (yang2016effort, ) proposed to build unsupervised defect predictors by sorting the reciprocal values of different change metrics on each testing data set in descending order. They reported that with efforts, many unsupervised predictors perform better than state-of-the-art supervised predictors.
4. Method
4.1. Unsupervised Predictors
In this section, we describe the effort-aware just-in-time unsupervised defect predictors proposed by Yang et al. (yang2016effort, ), which serves as a baseline method in this study. As described by Yang et al. (yang2016effort, ), their simple unsupervised defect predictor is built on change metrics as shown in Table 1. These 14 different change metrics can be divided into 5 dimensions (kamei2013large, ):
- •
Diffusion: NS, ND, NF and Entropy.
- •
Size: LA, LD and LT.
- •
Purpose: FIX.
- •
History: NDEV, AGE and NUC.
- •
Experience: EXP, REXP and SEXP.
The diffusion dimension characterizes how a change is distributed at different levels of granularity. As discussed by Kamei et al. (kamei2013large, ), a highly distributed change is harder to keep track and more likely to introduce defects. The size dimension characterizes the size of a change and it is believed that the software size is related to defect proneness (nagappan2005use, ; koru2009investigation, ). Yin et al. (yin2011fixes, ) report that the bug-fixing process can also introduce new bugs. Therefore, the Fix metric could be used as a defect evaluation metric. The History dimension includes some historical information about the change, which has been proven to be a good defect indicator (matsumoto2010analysis, ). For example, Matsumoto et al. (matsumoto2010analysis, ) find that the files previously touched by many developers are likely to contain more defects. The Experience dimension describes the experience of software programmers for the current change because Mockus et al. (mockus2000predicting, ) show that more experienced developers are less likely to introduce a defect. More details about these metrics can be found in Kamei et al’s study (kamei2013large, ).
In Yang et al.’s study, for each change metric of testing data, they build an unsupervised predictor that ranks all the changes based on the corresponding value of in descending order, where is the value of the selected change metric for each change . Therefore, the changes with smaller change metric values will ranked higher. In all, for each project, Yang et al. define 12 simple unsupervised predictors (LA and LD are excluded as Yang et al. (yang2016effort, )).
4.2. Supervised Predictors
To further evaluate the unsupervised predictor, we selected some supervised predictors that already used in Yang et al.’s work.
As reported in both Yang et al.’s (yang2016effort, ) and Kamei et al.’s (kamei2013large, ) work, EALR outperforms all other supervised predictors for effort-aware JIT defect prediction. EALR is a modified linear regression model (kamei2013large, ) and it predicts instead of predicting , where indicates whether this change is a defect or not ( or [math]) and represents the effort required to inspect this change. Note that this is the same method to build EALR as Kamei et al. (kamei2013large, ).
In defect prediction literature, IBk (KNN), J48 and Random Forests methods are simple yet widely used as defect learners and have been proven to perform, if not best, quite well for defect prediction (lessmann2008benchmarking, ; menzies2007data, ; hall2012systematic, ; turhan2009relative, ). These three learners are also used in Yang et al’s study. For these supervised predictors, was used as the dependant variable. For KNN method, we set according to Yang et al. (yang2016effort, ).
4.3. OneWay Learner
Based on our preliminary experiment results shown in the following section, for the six projects investigated by Yang et al, some of 12 unsupervised predictors do perform worse than supervised predictors and there is no one predictor constantly working best on all project data. This means we can not simply say which unsupervised predictor works for the new project before predicting on the testing data. In this case, we need a technique to select the proper metrics to build defect predictors.
We propose OneWay learner, which is a supervised predictor built on the implication of Yang et al’s simple unsupervised predictors. The pseudocode for OneWay is shown in Algorithm 1. In the following description, we use the superscript numbers to denote the line number in pseudocode.
The general idea of OneWay is to use supervised training data to remove all but one of the Yang et al. predictors and then apply this trained learner on the testing data. Specifically, OneWay firstly builds simple unsupervised predictors from each metric on training dataL4, then evaluates each of those learners in terms of evaluation metricsL5, like , Recall, Precision and F1. After that, if the desirable evaluation goal is set, the metric which performs best on the corresponding evaluation goal is returned as the best metric; otherwise, the metric which gets the highest mean score over all evaluation metrics is returnedL9(In this study, we use the latter one). Finally, a simple predictor is built only on such best metricL10 with the help of training data. Therefore, OneWay builds only one supervised predictor for each project using the local data instead of 12 predictors directly on testing data as Yang et al (yang2016effort, ) .
5. Experimental Settings
5.1. Research Questions
Using the above methods, we explore three questions:
- •
Do all unsupervised predictors perform better than supervised predictors?
- •
Is it beneficial to use supervised data to prune all but one of the Yang et al. unsupervised predictors?
- •
Does OneWay perform better than more complex standard supervised predictors?
When reading the results from Yang et al. (yang2016effort, ), we find that they aggregate performance scores of each learner on six projects, which might miss some information about how learners perform on each project. Are these unsupervised predictors working consistently across all the project data? If not, how would it look like? Therefore, in RQ1, we report results for each project separately.
Another observation is that even though Yang et al. (yang2016effort, ) propose that simple unsupervised predictors could work better than supervised predictors for effort-aware JIT defect prediction, one missing aspect of their report is how to select the most promising metric to build a defect predictor. This is not an issue when all unsupervised predictors perform well but, as we shall see, this is not the case. As demonstrated below, given unsupervised predictors, only a small subset can be recommended. Therefore it is vital to have some mechanism by which we can down select from models to the that are useful. Based on this fact, we propose a new method, OneWay, which is the missing link in Yang et al.’s study (yang2016effort, ) and the missing final step they do not explore. Therefore, in RQ2 and RQ3, we want to evaluate how well our proposed OneWay method performs compared to the unsupervised predictors and supervised predictors.
Considering our goals and questions, we reproduce Yang et al’s results and report for each project to answer RQ1. For RQ2 and RQ3, we implement our OneWay method, and compare it with unsupervised predictors and supervised predictors on different projects in terms of various evaluation metrics.
5.2. Data Sets
In this study, we conduct our experiment using the same data sets as Yang et al.(yang2016effort, ), which are six well-known open source projects, Bugzilla, Columba, Eclipse JDT, Eclipse Platform, Mozilla and PostgreSQL. These data sets are shared by Kamei et al. (kamei2013large, ). The statistics of the data sets are listed in Table 2. From Table 2, we know that all these six data sets cover at least 4 years historical information, and the longest one is PostgreSQL, which includes 15 years of data. The total changes for these six data sets are from to , which are sufficient for us to conduct an empirical study. In this study, if a change introduces one or more defects then this change is considered as defect-introducing change. The percentage of defect-introducing changes ranges from 5% to 36%. All the data and code used in this paper is available online222https://github.com/WeiFoo/RevisitUnsupervised.
5.3. Experimental Design
The following principle guides the design of these experiments:
*Whenever there is a choice between methods, data, etc., we will always prefer the techniques used in Yang et al. (yang2016effort, ).
*By applying this principle, we can ensure that our experimental setup is the same as Yang et al. (yang2016effort, ). This will increase the validity of our comparisons with that prior work.
When applying data mining algorithms to build predictive models, one important principle is not to test on the data used in training. To avoid that, we used time-wise-cross-validation method which is also used by Yang et al. (yang2016effort, ). The important aspect of the following experiment is that it ensures that all testing data was created after training data. Firstly, we sort all the changes in each project based on the commit date. Then all the changes that were submitted in the same month are grouped together. For a given project data set that covers totally months history, when building a defect predictor, consider a sliding window size of ,
- •
The first two consecutive months data in the sliding window, th and th, are used as the training data to build supervised predictors and OneWay learner.
- •
The last two months data in the sliding window, th and th, which are two months later than the training data, are used as the testing data to test the supervised predictors, OneWay learner and unsupervised predictors.
After one experiment, the window slides by “one month” data. By using this method, each training and testing data set has two months data, which will include sufficient positive and negative instances for the supervised predictors to learn. For any project that includes months data, we can perform different experiments to evaluate our learners when is greater than 5. For all the unsupervised predictors, only the testing data is used to build the model and evaluate the performance.
To statistically compare the differences between OneWay with supervised and unsupervised predictors, we use Wilcoxon single ranked test to compare the performance scores of the learners in this study the same as Yang et al. (yang2016effort, ). To control the false discover rate, the Benjamini-Hochberg (BH) adjusted p-value is used to test whether two distributions are statistically significant at the level of (benjamini1995controlling, ; yang2016effort, ). To measure the effect size of performance scores among OneWay and supervised/unsupervised predictors, we compute Cliff’s that is a non-parametric effect size measure (romano2006exploring, ). As Romano et al. suggested, we evaluate the magnitude of the effect size as follows: negligible ( ), small (), medium ( ), and large (0.474 ) (romano2006exploring, ).
5.4. Evaluation Measures
For effort-aware JIT defect prediction, in addition to evaluate how learners correctly predict a defect-introducing change, we have to take account the efforts that are required to inspect prediction. Ostrand et al. (ostrand2005predicting, ) report that given a project, of the files contain on average of all defects in the project. Although there is nothing magical about the number , it has been used as a cutoff value to set the efforts required for the defect inspection when evaluating the defect learners (yang2016effort, ; kamei2013large, ; mende2010effort, ; monden2013assessing, ). That is, given effort, how many defects can be detected by the learner. To be consistent with Yang et al, in this study, we restrict our efforts to of total efforts.
To evaluate the performance of effort-aware JIT defect prediction learners in our study, we used the following 4 metrics: Precision, Recall, F1 and , which are widely used in defect prediction literature (menzies2007data, ; menzies2010defect, ; zimmermann2007predicting, ; kamei2013large, ; yang2016effort, ; monden2013assessing, ).
[TABLE]
where Precision denotes the percentage of actual defective changes to all the predicted changes and Recall is the percentage of predicted defective changes to all actual defective changes. *F1 * is a measure that combines both Precision and Recall which is the harmonic mean of Precision and Recall.
The last evaluation metric used in this study is , which is defined as , where is the area between the effort (code-churn-based) cumulative lift charts of the optimal model and the prediction model (as shown in Figure 1). In this chart, the x-axis is considered as the percentage of required effort to inspect the change and the y-axis is the percentage of defect-introducing change found in the selected change. In the optimal model, all the changes are sorted by the actual defect density in descending order, while for the predicted model, all the changes are sorted by the actual predicted value in descending order.
According to Kamei et al. and Xu et al. (yang2016effort, ; kamei2013large, ; monden2013assessing, ), can be normalized as follows:
[TABLE]
where , and represent the area of curve under the optimal model, predicted model, and worst model, respectively. Note that the worst model is built by sorting all the changes according to the actual defect density in ascending order. For any learner, it performs better than random predictor only if the is greater than 0.5.
Note that, following the practices of Yang et al. (yang2016effort, ), we measure Precision, Recall, F1 and at the effort = point. In this study, in addition to and (i.e., Recall) that is used in Yang et al’s work (yang2016effort, ), we include Precision and F1 measures and they provide more insights about all the learners evaluated in the study from very different perspectives, which will be shown in the next section.
6. Empirical Results
In this section, we present the experimental results to investigate how simple unsupervised predictors work in practice and evaluate the performance of the proposed method, OneWay, compared with supervised and unsupervised predictors.
Before we start off, we need a sanity check to see if we can fully reproduce Yang et al.’s results. Yang et al. (yang2016effort, ) provide the median values of and Recall for the EALR model and the best two unsupervised models, LT and AGE, from the time-wise cross evaluation experiment. Therefore, we use those numbers to check our results.
As shown in Table 3 and Table 4, for unsupervised predictors, LT and AGE, we get the exact same performance scores on all projects in terms of Recall and . This is reasonable because unsupervised predictors are very straightforward and easy to implement. For the supervised predictor, EALR, these two implementations do not have differences in , while the maximum difference in Recall is only . Since the differences are quite small, then we believe that our implementation reflects the details about EALR and unsupervised learners in Yang et al. (yang2016effort, ).
For other supervised predictors used in this study, like J48, IBk, and Random Forests, we use the same algorithms from Weka package (hall2009weka, ) and set the same parameters as used in Yang et al. (yang2016effort, ).
RQ1: Do all unsupervised predictors perform better than supervised predictors?
To answer this question, we build four supervised predictors and twelve unsupervised predictors on the six project data sets using incremental learning method as described in Section 5.3.
Figure 2 shows the boxplot of Recall, , F1 and Precision for supervised predictors and unsupervised predictors on all data sets. For each predictor, the boxplot shows the 25th percentile, median and 75 percentile values for one data set. The horizontal dashed lines indicate the median of the best supervised predictor, which is to help visualize the median differences between unsupervised predictors and supervised predictors.
The colors of the boxes within Figure 2 indicate the significant difference between learners:
- •
The blue color represents that the corresponding unsupervised predictor is significantly better than the best supervised predictor according to Wilcoxon signed-rank, where the BH corrected p-value is less than 0.05 and the magnitude of the difference between these two learners is NOT trivial according to Cliff’s delta, where .
- •
The black color represents that the corresponding unsupervised predictor is not significantly better than the best supervised predictor or the magnitude of the difference between these two learners is trivial, where .
- •
The red color represents that the corresponding unsupervised predictor is significantly worse than the best supervised predictor and the magnitude of the difference between these two learners is NOT trivial.
From Figure 2, we can clearly see that not all unsupervised predictors perform statistically better than the best supervised predictor across all different evaluation metrics. Specifically, for Recall, on one hand, there are only , , , , and of all unsupervised predictors that perform statistically better than the best supervised predictor on six data sets, respectively. On the other hand, there are , , , , and of all unsupervised predictors perform statistically worse than the best supervised predictor on the six data sets, respectively. This indicates that:
- •
About of the unsupervised predictors perform worse than the best supervised predictor on any data set;
- •
Without any prior knowledge, we can not know which unsupervised predictor(s) works adequately on the testing data.
Note that the above two points from Recall also hold for .
For F1, we see that only LT on Bugzilla and AGE on PostgreSQL perform statistically better than the best supervised predictor. Other than that, no unsupervised predictor performs better on any data set. Furthermore, surprisingly, no unsupervised predictor works significantly better than the best supervised predictor on any data sets in terms of Precision. As we can see, Random Forests performs well on all six data sets. This suggests that unsupervised predictors have very low precision for effort-aware defect prediction and can not be deployed to any business situation where precision is critical.
Overall, for a given data set, no one specific unsupervised predictor works better than the best supervised predictor across all evaluation metrics. For a given measure, most unsupervised predictors did not perform better across all data sets. In summary: {myshadowbox} Not all unsupervised predictors perform better than supervised predictors for each project and for different evaluation measures.
Note the implications of this finding: some extra knowledge is required to prune the worse unsupervised models, such as the knowledge that can come from labelled data. Hence, we must conclude the opposite to Yang et al.; i.e. some supervised labelled data must be applied before we can reliably deploy unsupervised defect predictors on testing data.
RQ2: Is it beneficial to use supervised data to prune away all but one of the Yang et al. predictors?
To answer this question, we compare the OneWay learner with all twelve unsupervised predictors. All these predictors are tested on the six project data sets using the same experiment scheme as we did in RQ1.
Figure 3 shows the boxplot for the performance distribution of unsupervised predictors and the proposed OneWay learner on six data sets across four evaluation measures. The horizontal dashed line denotes the median value of OneWay. Note that in Figure 4, blue means this learner is statistically better than OneWay, red means worse, and black means no difference. As we can see, in Recall, only one unsupervised predictor, LT, outperforms OneWay in data sets. However, OneWay significantly outperform, , , , and of total unsupervised predictors on six data sets, respectively. This observation indicates that OneWay works significantly better than almost all learners on all 6 data sets in terms of Recall.
Similarly, we observe that only LT predictor works better than OneWay in data sets in terms of and AGE outperforms OneWay only on the platform data set. For the remaining experiments, OneWay performs better than all the other predictors (on average, 9 out of 12 predictors).
In addition, according to F1, only three unsupervised predictors EXP/REXP/SEXP perform better than OneWay on the Mozilla data set and LT predictor just performs as well as OneWay (and has no advantage over OneWay). We note that similar findings can be observed in Precision measure.
Table 5 provides the median values of the best unsupervised predictor compared with OneWay for each evaluation measure on all data sets. Note that, in practice, we can not know which unsupervised predictor is the best out of the 12 unsupervised predictors by Yang et al.’s method before we access to the labels of testing data. In other words, to aid our analysis, the best unsupervised ones in Table 5 are selected when referring to the true labels of testing data, which are not available in practice. In that table, for each evaluation measure, the number in green cell indicates that the best unsupervised predictor has a large advantage over OneWay according to the Cliff’s ; Similarly, the yellow cell means medium advantage and the gray cell means small advantage.
From Table 5, we observe that out of 24 experiments on all evaluation measures, none of these best unsupervised predictors outperform OneWay with a large advantage according to the Cliff’s . Specifically, according to Recall and , even though the best unsupervised predictor, LT, outperforms OneWay on four and three data sets, all of these advantage are small. Meanwhile, REXP and EXP have a medium improvement over OneWay on one and two data sets for F1 and Precision, respectively. In terms of the average scores, the maximum magnitude of the difference between the best unsupervised learner and OneWay is . In other words, OneWay is comparable with the best unsupervised predictors on all data sets for all evaluation measures even though the best unsupervised predictors might not be known before testing.
Overall, we find that (1) no one unsupervised predictor significantly outperforms OneWay on all data sets for a given evaluation measure; (2) mostly, OneWay works as well as the best unsupervised predictor and has significant better performance than almost all unsupervised predictors on all data sets for all evaluation measures. Therefore, the above results suggest: {myshadowbox} As a simple supervised predictor, OneWay has competitive performance and it performs better than most unsupervised predictors for effort-aware JIT defect prediction.
Note the implications of this finding: the supervised learning utilized in OneWay can significantly outperform the unsupervised models.
RQ3: Does OneWay perform better than more complex standard supervised predictors?
To answer this question, we compare OneWay learner with four supervised predictors, including EALR, Random Forests, J48 and IBk. EALR is considered to be state-of-the-art learner for effort-aware JIT defect prediction (yang2016effort, ; kamei2013large, ) and all the other three learners are widely used in defect prediction literature over past years (lessmann2008benchmarking, ; fu2016tuning, ; kamei2013large, ; fukushima2014empirical, ; turhan2009relative, ; hall2012systematic, ). We evaluate all these learners on the six project data sets using the same experiment scheme as we did in RQ1.
From Figure 4, we have the following observations. Firstly, the performance of OneWay is significantly better than all these four supervised predictors in terms of Recall and on all six data sets. Also, EALR works better than Random Forests, J48 and IBk, which is consistent with Kamei et al’s finding (kamei2013large, ).
Secondly, according to F1, Random Forests and IBk perform slightly better than OneWay in two out of six data sets. For most cases, OneWay has a similar performance to these supervised predictors and there is not much difference between them.
However, when reading Precision scores, we find that, in most cases, supervised learners perform significantly better than OneWay. Specifically, Random Forests, J48 and IBk outperform OneWay on all data sets and EALR is better on three data sets. This finding is consistent with the observation in RQ1 where all unsupervised predictors perform worse than supervised predictors for Precision.
From Table 6, we have the following observation. First of all, in terms of Recall and , the maximum difference in median values between EALR and OneWay are and , respectively, which are and improvements over and on Mozilla and PostgreSQL data sets. For both measures, OneWay improves the average scores by and , which are and improvement over EALR. Secondly, according to F1, IBk outperforms OneWay on three data sets with a large, medium and small advantage, respectively. The largest difference in median is . Finally, as we discussed before, the best supervised predictor for Precision, Random Forests, has a very large advantage over OneWay on all data sets. The largest difference is on PostgreSQL data set.
Overall, according to the above analysis, we conclude that: {myshadowbox} OneWay performs significantly better than all four supervised learners in terms of Recall and ; It performs just as well as other learners for F1. As for Precision, other supervised predictors outperform OneWay.
Note the implications of this finding: simple tools like OneWay perform adequately but for all-around performance, more sophisticated learners are recommended.
As to when to use OneWay or supervised predictors like Random Forests, that is an open question. According to “No Free Lunch Theorems”(wolpert2002supervised, ), no method is always best and we show unsupervised predictors are often worse on a project-by-project basis. So “best” predictor selection is a matter of local assessment, requiring labelled training data (an issue ignored by Yang et al).
7. Threats to Validity
Internal Validity. The internal validity is related to uncontrolled aspects that may affect the experimental results. One threat to the internal validity is how well our implementation of unsupervised predictors could represent the Yang et al.’s method. To mitigate this threat, based on Yang et al “R”code, we strictly follow the approach described in Yang et al’s work and test our implementation on the same data sets as in Yang et al. (yang2016effort, ). By comparing the performance scores, we find that our implementation can generate the same results. Therefore, we believe we can avoid this threat.
External Validity. The external validity is related to the possibility to generalize our results. Our observations and conclusions from this study may not be generalized to other software projects. In this study, we use six widely used open source software project data as the subject. As all these software projects are written in java, we can not guarantee that our findings can be directly generalized to other projects, specifically to the software that implemented in other programming languages. Therefore, the future work might include to verify our findings on other software project.
In this work, we used the data sets from (yang2016effort, ; kamei2013large, ), where totally 14 change metrics were extracted from the software projects. We build and test the OneWay learner on those metrics as well. However, there might be some other metrics that not measured in these data sets that work well as indicators for defect prediction. For example, when the change was committed (e.g., morning, afternoon or evening), functionality of the the files modified in this change (e.g., core functionality or not). Those new metrics that are not explored in this study might improve the performance of our OneWay learner.
8. Conclusion and Future Work
This paper replicated and refutes Yang et al.’s results (yang2016effort, ) on unsupervised predictors for effort-ware just-in-time defect prediction. Not all unsupervised predictors work better than supervised predictors (on all six data sets, for different evaluation measures). This suggests that we can not randomly pick an unsupervised predictor to perform effort-ware JIT defect prediction. Rather, it is necessary to use supervised methods to pick best models before deploying them to a project. For that task, supervised predictors like OneWay are useful to automatically select the potential best model.
In the above, OneWay peformed very well for Recall, and F1. Hence, it must be asked: “Is defect prediction inherently simple? And does it need anything other than OneWay?”. In this context, it is useful to recall that OneWay’s results for precision were not competitive. Hence we say, that if learners are to be deployed in domains where precision is critical, then OneWay is too simple.
This study opens the new research direction of applying simple supervised techniques to perform defect prediction. As shown in this study as well as Yang et al.’s work (yang2016effort, ), instead of using traditional machine learning algorithms like J48 and Random Forests, simply sorting data according to one metric can be a good defect predictor model, at least for effort-aware just-in-time defect prediction. Therefore, we recommend the future defect prediction research should focus more on simple techniques.
For the future work, we plan to extend this study on other software projects, especially those developed by the other programming languages. After that, we plan to investigate new change metrics to see if that helps improve OneWay’s performance.
9. Addendum
As this paper was going to press, we learned of new papers that updated the Yang et al. study: Liu et al. at EMSE’17 (liu2017code, ) and Huang et al. at ICSMSE’17 (huang17, ). We thank these authors for the courtesy of sharing a pre-print of those new results. We also thank them for using concepts from a pre-print of our paper in their work333 Our pre-print was posted to arxiv.org March 1, 2017. We hope more researchers will use tools like arxiv.org to speed along the pace of software research.. Regretfully, we have yet to return those favors: due to deadline pressure, we have not been able to confirm their results.
As to technical specifics, Liu et al. use a single churn measure (sum of number of lines added and deleted) to build an unsupervised predictors that does remarkably better than OneWay and EARL (where the latter could access all the variables). While this result is currently unconfirmed, it could well have “raised the bar” for unsupervised defect prediction. Clearly, more experiments are needed in this area. For example, when comparing the Liu et al. methods to OneWay and standard supervised learners, we could (a) give all learners access to the churn variable; (b) apply the Yang transform of to all variables prior to learning; (c) use more elaborate supervised methods including synthetic minority over-sampling (Agrawa17, ) and automatic hyper-parameter optimization (fu2016tuning, ).
ACKNOWLEDGEMENTS
The work is partially funded by an NSF award #1302169.
The reference list from the paper itself. Each links out to its DOI / PubMed record.
- 1[1] Amritanshu Agrawal and Tim Menzies. ”better data” is better than ”better data miners” (benefits of tuning SMOTE for defect prediction). Co RR , abs/1705.03697, 2017.
- 2[2] Fumio Akiyama. An example of software system debugging. In IFIP Congress (1) , volume 71, pages 353–359, 1971.
- 3[3] Erik Arisholm and Lionel C Briand. Predicting fault-prone components in a java legacy system. In Proceedings of the 2006 ACM/IEEE international symposium on Empirical software engineering , pages 8–17. ACM, 2006.
- 4[4] Yoav Benjamini and Yosef Hochberg. Controlling the false discovery rate: a practical and powerful approach to multiple testing. Journal of the Royal Statistical Society. Series B (Methodological) , pages 289–300, 1995.
- 5[5] Shyam R Chidamber and Chris F Kemerer. A metrics suite for object oriented design. IEEE Transactions on Software Engineering , 20(6):476–493, 1994.
- 6[6] Marco D’Ambros, Michele Lanza, and Romain Robbes. An extensive comparison of bug prediction approaches. In 2010 7th IEEE Working Conference on Mining Software Repositories , pages 31–41. IEEE, 2010.
- 7[7] Wei Fu, Tim Menzies, and Xipeng Shen. Tuning for software analytics: Is it really necessary? Information and Software Technology , 76:135–146, 2016.
- 8[8] Wei Fu, Vivek Nair, and Tim Menzies. Why is differential evolution better than grid search for tuning defect predictors? ar Xiv preprint ar Xiv:1609.02613 , 2016.