TL;DR
This paper develops a formalism for calculating cubic interaction vertices and one-loop self-energy corrections in a stable string bit model with spin degrees of freedom, revealing how the energy scales with the number of bits and spin.
Contribution
It introduces a new formalism for cubic interaction vertices in a string bit model with no spatial movement, enabling calculation of one-loop energy corrections.
Findings
Ground state one-loop self-energy scales as M^{5-s/4} for even s and M^{4-s/4} for odd s.
For s=24, the self-energy scales as 1/M, resembling PoincarΓ© invariance in 1+1 dimensions.
Analytical calculations for M=3, s=1,2 and numerical confirmation for sβ€4.
Abstract
We provide a formalism to calculate the cubic interaction vertices of the stable string bit model, in which string bits have spin degrees of freedom but no space to move. With the vertices, we obtain a formula for one-loop self-energy, i.e., the correction to the energy spectrum. A rough analysis shows that, when the bit number is large, the ground state one-loop self-energy scale as for even and for odd . Particularly, in , we have , which resembles the Poincar\'e invariant relation in dimensions. We calculate analytically the one-loop correction for the ground energies with and . We then numerically confirm that the large behavior holds for cases.
Click any figure to enlarge with its caption.
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Figure 12
Figure 13
Figure 14| Conjugate | Energy | Grading of | ||
|---|---|---|---|---|
| 1 | even | |||
| 2 | odd |
| Conjugate | Energy | Grading of | ||
|---|---|---|---|---|
| 1 | even | |||
| 2 | even | |||
| 2 | even |
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Code & Models
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
β β institutetext: Institute for Fundamental Theory, Department of Physics, University of Florida,
Gainesville, Florida 32611, USA
Cubic interaction vertices and one-loop self-energy in the stable
string bit model
Gaoli Chen
Abstract
We provide a formalism to calculate the cubic interaction vertices of the stable string bit model, in which string bits have spin degrees of freedom but no space to move. With the vertices, we obtain a formula for one-loop self-energy, i.e., the correction to the energy spectrum. A rough analysis shows that, when the bit number is large, the ground state one-loop self-energy scale as for even and for odd . Particularly, in , we have , which resembles the PoincarΓ© invariant relation in dimensions. We calculate analytically the one-loop correction for the ground energies with and . We then numerically confirm that the large behavior holds for cases.
1 Introduction
In the string bit model [1], a string is a chain comprised of pointlike entities called string bits. While the chain is discretized, it behaves like a continuous string when the bit number is large enough.
The string bit model is an implementation of βt Hooftβs idea of holography [2, 3, 4]. In Lorentz invariant theory, spacetime can be described by lightcone coordinates with transverse dimensions and the ββ dimensions . In the string bit model, the coordinate of string bits is missing, and hence, the Lorentz invariance is not present a priori. String bits enjoy the dynamic of Galilean symmetry, under which the -component momentum is identified as , where is the mass of one string bit. When is large enough and is fixed, can be considered as a continuous variable and its conjugate can be interpreted as the missing coordinate. The Lorentz invariance can be therefore regained and string theory emerges.
With βt Hooftβs large limit [5, 6], the type II-B superstring was formulated in ref. [7] as a string bit model. In the model, a superstring bit creation operator, which was an adjoint representation of color group, has up to spin indices and moves in transverse space. A more drastic form of holography was studied in recent papers [8, 9, 10, 11], where string bits have no transverse coordinate and hence no space to move. However, new compactified bosonic coordinates can be generated from spin degrees of freedom of string bits. If suitable dynamics is chosen, these spin degrees of freedom are converted to one-dimensional spin waves, which then act as compactified bosonic coordinates. The perturbation of the latter model was studied in ref. [11], where the cubic interaction vertices and their application to the calculation of the one-loop self-energy were discussed.
Following the main idea of ref. [11], we continue the work in the following way.
- β’
A more detailed study of the cubic interaction vertices is performed. We present a systematic way to build conjugates of energy eigenfunctions, determine the sign factors of the vertices, and (anti)symmetrize the vertices, which are denoted as and and shown as Figure 1, over the indices and . We then show that the interaction vertices can be calculated by finding the vacuum expectation values of ladder operators. These are necessary for the use of interaction vertices in our calculation of observables.
- β’
The calculation of the one-loop self-energy is improved, and its large behavior for the ground states is analyzed. We assemble the ingredients necessary to calculate the one-loop self-energy. The one-loop self-energies of ground states, , are studied, and their large behavior is analyzed. We calculate analytically for the and cases. A qualitative analysis shows that scales as for even and for odd . The scaling behavior is consistent with Lorentz invariance in dimensions when , the critical Grassmann dimension, and the protostring model [11] emerges.
- β’
is determined numerically for higher and . We confirm the large behavior of for . We also verify that increases exponentially with respect to when is fixed. We generalize the Hamiltonian of the model by adding terms and numerically show that, for the case, the Hamiltonian is bounded from below with respect to only when . Our analysis suggests that this is true for all the even cases. The result shows that the generalization is necessary for building a physical string bit model.
The rest of this paper is organized as follows. In section 2, we review some results of stable string bit models obtained by [11]. Specifically, we introduce the Hamiltonian of the model, solve for the energy spectrum of the model at , and summarize the three chains overlap calculation. In section 3, we provide a systematic approach to build conjugate eigenfunctions, which will be used in the calculation of the expansion. In section 4, the cubic interaction vertices are studied by perturbation. In section 5, we use the cubic interaction vertices to calculate one-loop self-energies. Numerical results for the one-loop self-energy are analyzed in section 6. The main text is closed with a conclusion section. Finally, several Appendixes are included for technical details.
2 Stable string bit model
The purpose of this section is to review some results of stable string bit models obtained in ref. [11] and introduce useful notations. These results are necessary for setting up the expansion of the model. Meanwhile some modifications specific to this paper are incorporated. To be clear, the modifications are as follows. In Sec. 2.1, we add an term to the Hamiltonian of the model. In Sec. 2.2, the diagonalization of the Hamiltonian at is done via different intermediate variables.
2.1 Hamiltonian
The superstring bit creation operator is
[TABLE]
where are totally antisymmetric spin indices and , color indices of . is bosonic when is even and fermionic when is odd. In Fock space, a closed string is represented by a color singlet trace operator acting on the vacuum state, that is of the form . The number of in the trace operator is the eigenvalue of the bit number operator .
The Hamiltonian to be studied in this paper reads
[TABLE]
where expressions of and are given in eqs. (A.3) and (A.6). The s make an contribution to , while makes only contribution and hence does not affect the large limit. We note that is a generalization of the Hamiltonian in refs. [8, 10]. The parts have been proposed in refs. [9, 11]; is the new term added by this paper and its derivation is given in Appendix A.1.
Let us now consider the action of on trace states space, which is defined as follows. We introduce Grassmann coordinates , and then define a superbit creation operator
[TABLE]
and a single trace operator
[TABLE]
where are -component Grassmann variables. The trace states space, i.e., color singlet subspace of Fock space, is then spanned by states like
[TABLE]
where is the vacuum state. The action of each and on trace states is given in Appendix A. To summarize the results, let us define
[TABLE]
Then the actions of on single and double trace states can be written as111The actions of each on single and double trace states are shown in Appendix A.
[TABLE]
[TABLE]
Note that in eqs. (6), the term of should be zero even if , as they label different variables.
While acts on the trace states, to solve for energy eigenstates, it is helpful to convert to an equivalent form acting on the wave function of an energy eigenstate at . The wave function is defined as follows. It follows from eq. (5) that, at , evolves single trace states to single trace states. Therefore, we can express a single trace energy state as
[TABLE]
where is the wave function. Since is invariant under the cyclic permutation , we can constrain by
[TABLE]
without loss of generality. The sign factor follows from the fact that the measure is changed by a factor under the cyclic transformation . Now, the action of on is
[TABLE]
where we have performed an integration by parts in the last step and
[TABLE]
Note that, in the derivation of , the case needs special treatment. Likewise, the action of on is equivalent to the action on by
[TABLE]
2.2 Diagonalizing Hamiltonian
at
Now let us solve for the energy spectrum of the model at . A single trace energy eigenstate is determined by an eigenfunction satisfying the equation
[TABLE]
To solve the eigenvalue problem eq. (12), we need to find the lowering and raising eigenoperators of . This has been done by ref. [11]. Here, we repeat the procedure with different sets of intermediate variables.
From (10), we see that each term of contains only variables or derivatives of the same . It implies the variables can be separated and we only need to solve the equation of one variable. We therefore drop the spin index in the following calculation.
We introduce Fourier transforms [10, 8]
[TABLE]
which satisfy
[TABLE]
In ref. [11], instead of and , the diagonalization was done via the Grassmann variables , , and their Fourier transforms. Such different choices should not affect the eigenoperators and the energy spectrum.
The Hermiticity of the Hamiltonian implies that from which it follows that
[TABLE]
We now express in terms of and as
[TABLE]
and seek for eigenoperators of ,
[TABLE]
where and are constants. Substituting (15) into (16) yields
[TABLE]
We then normalize the coefficients of to obtain the lowering and raising operators for ,
[TABLE]
The phase factors are chosen so that the expression of in terms of eigenoperators will have a simple form; see eq. (53). A direct calculation shows that the eigenoperators satisfy the following anticommutation relations
[TABLE]
To obtain the energy spectrum, we need to find the ground energy and the ground eigenfunction , which is annihilated by all the lowering operators. Since the zero mode does not change energy eigenvalues, there are degeneracies in ground state. To eliminate the ambiguity, we require the ground eigenfunction to be annihilated by the zero mode as well. The ground eigenfunction can be [10]
[TABLE]
where indicates the integral part of . To verify , one only needs to check that
[TABLE]
Acting on the ground eigenfunction, we obtain the ground energy
[TABLE]
We can now build general eigenfunctions for arbitrary case. The ground eigenfunction and energy are
[TABLE]
where each has the form of (19). A general energy eigenfunction and its corresponding energy can be written as
[TABLE]
where we have defined as a string of eigenoperators and we choose as a convention. To build a physical state, the modes (24a) need to satisfy the cyclic constraint (8). Under the cyclic permutation , transforms as . It then follows from eq. (8) that the modes must satisfy
[TABLE]
Since the zero modes do not change the energy, the ground energy eigenstate has at least degeneracies. This is the consequence of commuting with supersymmetry operators , as defined in eq. (A.8). The constraint (25) has a profound impact on the energy spectrum of the model. When is even, all the ground states are allowed by (25) and are hence physical. But when is odd, the ground state is allowed only when is odd. It then follows that the lowest single trace state for even is the one corresponding to .
2.3 Three chains overlap
We have constructed the energy eigenfunctions for . To obtain the expansion results, we also need to calculate the overlap among three chains: one large chain of bits and two small chains of bits and bits. The calculation can be done by establishing the relation among the eigenoperators of large chain and two small chains. Here, we recap the results of ref. [11].
Let us only consider the case. Let and be lowering operators of -bit and -bit chains. Define a set of operators
[TABLE]
which satisfy the anticommutation relationship and . Note that equals of the large chain [11]. We then express the large chain operators in terms of and as
[TABLE]
The anticommutation relation among and requires
[TABLE]
The matrix elements of and are given by
[TABLE]
and [11]
[TABLE]
where in eqs. (29). When is large, the determinate of can be approximated as [11]
[TABLE]
We then express the ground eigenfunction of the large chain as
[TABLE]
where and are ground eigenfunction for two small chains. The constraints imply
[TABLE]
From the above construction, it is clear that the first rows and columns of the matrices , , and are trivial. One can therefore write them as , , and where , , and are nontrivial matrices of dimension .
With (28) and (32), we can simplify (31):
[TABLE]
[TABLE]
3 Conjugate eigenfunction
We have built energy eigenfunctions of the model at in Sec. 2.2. To calculate expansion results, we also need to find functions that conjugate to the energy eigenfunctions. For convenience, we call these functions conjugate eigenfunctions. In this section, we will construct conjugate eigenfunctions systematically.
A conjugate eigenfunction is a function of that satisfies the normalization condition [11]
[TABLE]
and the completeness relation
[TABLE]
where the delta function is understood to be symmetrized under cyclic constraint like (8).222To be specific, it means that
We stress that, once there is a complete set of and fulfilling the normalization condition, the completeness relation is satisfied automatically.
To construct explicitly, it is convenient to define operators as conjugate to under integration by parts,
[TABLE]
where the superscript is chosen if is Grassmann even and is chosen otherwise. It then follows from eqs. (17) that
[TABLE]
[TABLE]
In the remainder of this paper, we may suppress the superscript if there is no danger of ambiguity.
In the case, we claim that the conjugate to the ground eigenfunction is
[TABLE]
In Appendix B, we verify that satisfies the normalization condition (34). The function conjugate to the general eigenfunction (24a) can be built by acting on with a string of as
[TABLE]
where all the s pick if is Grassmann even and otherwise. The normalization condition (34) can be easily verified,
[TABLE]
where we used (36) in the second equality and (18) in the third equality. In the last equality, the sign factor of cancels the sign introduced by the rearrangement of the measure from to .
By analogy with (31), for the case, the overlap of conjugate eigenfunctions among the large chain and two small chains is given by
[TABLE]
where picks if is even and if is odd and all the notations follow the ones of Sec. 2.3.
Let us conclude this section by discussing the grading of energy eigenstates and eigenfunctions. We define
[TABLE]
Now, we can write the trace operator as a linear combination of . Let , where is independent of ; then
[TABLE]
where the sign factor comes from the commutation of the measure and . It implies that differs from only by a sign factor. So, we have and
[TABLE]
Finally, from eqs. (42), (34), and (23), we obtain the gradings (modulo 2) of functions and operators as Table 1. These results will be used in the next section.
4 Cubic interaction vertices
Let , , and be energy eigenstates of strings with , , and bits respectively; then the interaction vertices and are defined as[11]
[TABLE]
The vertex represents the amplitude of breaking one large string into two small strings and the vertex represents the amplitude of joining two small strings into one large string. Without loss of generality, we can (anti)symmetrize the vertices over indices and as
[TABLE]
In this section, we shall find that
[TABLE]
Several notations are used in (45) for convenience. and the superscript indicates that only operators of spin index are involved. The brackets stand for vacuum expectation values of operators
[TABLE]
where the matrix and operators are defined as (32) and (26) and is given by (10). The vacuum of (46a) is the state annihilated by all lowering operators of -bit and -bit systems, i.e., . In the following, we first mark remarks on the interaction vertices in the Sec. 4.1 and then give all the techenical details of the derivation of (45) in Sec. 4.2.
4.1 Remarks on vertices
The form of vertices in (45) can be interpreted as follows. The prefactor of shows that, when a large chain splits into two small chains of and bits, there are ways to choose the break points, and each way contributes equally to . Likewise, the prefactor of shows that, when two small chains join into a large chain, there are ways to choose the joint points, and each way contributes equally to . The operator reflects the fact that, to break one -bit string into -bit and -bit strings, one needs to connect bit to bit and bit to bit . Similarly, the operator reflects the fact that, to join back the above two small strings into one, one needs to connect bit to bit and bit to bit . The difference of factor between and is because that, when joining two strings, one can inverse the labels of the first small string as to obtain a different large string.
4.2 Derivation of and
Now, let us derive the formula (45). Acting the Hamiltonian to the zeroth order energy eigenstate and using (7) and (5), we have
[TABLE]
where in the second equality we renamed the indices as and in the last equality we used (42). Comparing (47) with (43a), we arrive at
[TABLE]
The vertex is decorated with a tilde because we have not yet applied the constraint (44) to it. Note that the sign factor is changed due to the reorder of and .
The action of on the double trace produces both fusion and fission terms:
[TABLE]
Comparing the above with (43b), we have , where
[TABLE]
[TABLE]
Note that so far the derivation of and follows the one of ref. [11] except that we changed the notation slightly and determined the sign factors of the vertices, which are overlooked by ref. [11] in eqs. (21) and (27).
Now, let us simplify and . We denote the integral with index in (48) as . It can be shown as follows that all the integrals are the same. For the integral with index , we can rename all integration variables as and then use the cyclic constraint (8) to bring and the measure to their original form. The value of the integral is invariant under both changes but is changed to . It implies that is independent of and we can choose for every integral to give
[TABLE]
To find the vertex satisfying the constraint (44), we let , where can be obtained by exchanging , :
[TABLE]
We therefore have
[TABLE]
where is given by (46b).
We perform a similar calculation for the vertex. All the integrals of and are independent of the indices and . So we can simply replace the sums over and with the factor . We then rename to and fix the indices as for and for to give
[TABLE]
Exchanging and , we have
[TABLE]
Renaming the integral variables as , , under which becomes , and then applying the property that is invariant under the cyclic permutation 333One can show that is invariant under the cyclic permutation as follows. From eq. (39a) and (39b), we see that as . It then follows that transforms as . From the cyclic constraint (25), we see that transforms in the same way as . Therefore, is invariant., we obtain that , which implies that .
Let us now get rid of the integral in the expression of . For simplicity, we consider the case. We use (24a) and (40a) to write , and similarly for states and . We then use (33) to express in terms of and . By a little algebra, we arrive at
[TABLE]
The ground eigenfunctions and are annihilated by any lowering eigenoperators of the small chains. Their conjugates and can be annihilated by any raising eigenoperators of the small chains, as eq. (B.3) shows. Therefore, the rhs of (52) can be interpreted as a vacuum expectation value of the operator . We therefore have
[TABLE]
where the vacuum is understood to be the state annihilated by all and . We perform a similar calculation for and find
[TABLE]
Note that and have the same sign factor . We shall see that physical observables, like one-loop self-energies, only depend on products like . It implies that the sign factors are unphysical and can be dropped in the calculation of physical observables. So, for arbitrary , up to a common unphysical sign factor, we can express and as products of vacuum expectation values over spin index . We therefore obtain the formula (45).
To calculate the vacuum expectation values, we need to express and in terms of eigenoperators. From eqs. (C.4), (C.3), and (C.5), we have
[TABLE]
where
[TABLE]
5 One-loop self-energy
One application of the interaction vertices is to calculate the one-loop self-energy, i.e., the correction to energy spectrum. In this section, we will first express the one-loop self-energy in terms of cubic interaction vertices [11]. We then apply the results of previous sections and obtain a formula for analytic and numerical computation.
For a finite energy eigenstate, we use the ansatz
[TABLE]
where the coefficients are c-numbers of order . Imposing the eigenvalue equation and using perturbation theory, we obtain [11]
[TABLE]
where is the leading order correction to , i.e., . We stress that the vertices in (57) should be the ones satisfying the constraint (44); otherwise, it would lead to an incorrect .
We now apply the formulas of and to (57). Let us first consider the case. The zero modes require special treatment. Substitute (45a) and (45b) into (57) and write the sum over zero modes explicitly,
[TABLE]
where we wrote as for convenience and indicates the sum over states without zero modes. We can replace and with and given the following reasoning. The sum over and produces four terms. For the term with , we find by eqs. (26a) and (26d). The phase is irrelevant. The and terms are quadratic forms of and . One can easily verify that . So, the sum over and can be replaced by the one over and . We then have
[TABLE]
For arbitrary , is replaced by , and each term inside the summation becomes a product over . So, we have
[TABLE]
Note that the sum over can be performed for each independently. So, we can move the sum over inside the product over to give
[TABLE]
where .
5.1 Ground energy correction
In principle, we can now calculate one-loop self-energy for any single trace energy state with eq. (58). But in general, the calculation is tedious. Let us consider the simplest case that is the ground state, i.e., . For convenience, we denote as . We only consider the case here, since cases are simply products of the case.
We need to calculate the vacuum expectation value . In terms of eigenoperators, contains quadratic terms of the form , , and and a constant term , as eq. (53) shows. Since , only the and the constant terms make a nonzero contribution:
[TABLE]
To calculate the result of term, we need to express in terms of a linear combination of and , as (27) shows, and commute through the exponential. This is done in Appendix D. Using eq. (D.1), we have
[TABLE]
where
[TABLE]
with and defined in (54). Finally, the vacuum expectation values on the rhs of (59) can be calculated using
[TABLE]
where is the set of all permutations of integers, is the signature of permutation , and indicates the sum over permutations satisfying
[TABLE]
Combining the above together, we can calculate the one-loop self-energy of the ground state. As the complete formula is very complicated, we do not bother writing it here. In Appendix E, we show examples of using formula (58) to calculate the one-loop self-energies of the and cases. For , we have
[TABLE]
and for , we have
[TABLE]
In general, is a polynomial of of degree .
5.2 Large behavior
We conclude this section by considering the large behavior of 444The large discussion is mainly based on comments by Charles Thorn.. The vacuum expectation values in (58) only depends on the ratio and therefore can be considered as . So, when is large,
[TABLE]
In (60), the factor scales as , scales as by eq. (30), and the sum over gives another factor of . These three parts produce a factor scale as .
We then consider the large behavior of . When is even, both and can be ground states, and hence by eq. (22). When is odd, has to be odd in order to have the physical -bit ground state, and one of the small strings must have an even bit number. It implies that the ground state of one small chain is forbidden by the cyclic constraint (25). Therefore, for odd .
Combining the above together, we have
[TABLE]
In analogy with the standard string theory, we can infer from eq. (61) the critical Grassmann dimension of the model, where Lorentz invariance in dimensions is regained. In the lightcone coordinates, is identified as , and is identified as . So, the Poincar invariant dispersion relation implies . Therefore, the Lorentz invariance requires . The model in the special case is called the protostring model[11].
6 Numerical results
We have derived a formula for the one-loop correction to the ground energy. As Appendix E shows, however, the calculation is tedious even for the simplest case. We therefore turn to numerical computation555The source code for the numerical computation can be found in ref. [12].. As the complexity of the calculation grows dramatically, the highest for which we performed numerical computation is 27 for and 16 for and continues decreasing as increases. Since only the ground energy is considered, we will simply write the ground energy as and its correction as and also suppress the factor.
We first compare the perturbation results with the exact numerical results, which are obtained by the method of ref. [10]. Figure 2 plots the change of ground energy with respect to the for and in the case. The solid lines are exact numerical results, and the dashed lines are perturbation results. We see that the two types of results match very well for large enough. One interesting observation is that, when is small, the perturbation results of are lower than the exact results, while the perturbation results of are above the exact results. It implies that the correction is positive for and negative for .
We then verify the large behavior of . Instead of plotting with respect to , we study its βinner structureβ, that is the contribution of each to , denoted by and defined as
[TABLE]
Since the power of in the large behavior of is 1 lower than that of , we introduce the normalized to remove the dependence:
[TABLE]
We expect that, for fixed and , only depends on the ratio .
The plots of as a function of are shown in Fig. 3, where for all four plots. When is odd, only odd values of are allowed and each has two curves, one for odd points and the other one for even points, for a reason will be clear shortly. For cases, the curves of different values are very close to each other, so the asymptotic behavior is evident. For the case, the gaps between consecutive curves become smaller as increases, which is consistent with the expected asymptotic behavior. It is therefore fair to conclude that the large behavior is confirmed.
The fact that there are two curves for each in odd cases can be understood as follows. Let us consider the case and take examples of and , where the former has a much lower contribution to than the latter according to the plots. Assuming that is large enough, we have the other small chains with bit number . Since is odd, is even for and odd for . The lowest energies of these two cases, which are equal to according to (24b) and the cyclic constraint (25), differ only by . Now, we compare these two cases in the low energy regime, in which the gap between energy levels and the lowest energies are at most of order . Consider the numbers of states in the low energy regime. Because of the cyclic constraint, only chains with an even bit number have excited states with energy gaps of order above the lowest energy. For , the number of states in the low energy regime roughly equals , the partition number of ; for , it equals . It implies that the low energy regime of is much denser than the one of . Therefore, for large enough , the case has much lower average energy than the case. This reasoning holds when is small. Hence, small odd cases have a lower contribution to than small even .
We next consider the effect of the parameter. Figure 4 shows the plots of with respect to for with different values of . From the plots, the and cases show a smooth asymptotic behavior as the cases in Fig. 3. But when is close to , curves are not smooth and intersect each other. When , the curve moves downward as increases, which implies that decreases as increases. So, is not bounded from below, and the system is not stable. In contrast, when , the curve moves upward as increases, which implies a stable system. This is related to a special feature of the case. Recall that the Hamiltonian has an part shown as (A.3a). This part produces a term like . When is even, is a scalar and this term behaves like a scalar potential with a negative coefficient, which leads to a dangerous instability. But when , this term is canceled exactly by . That being said, for even , is the minimal value for the potential to be bounded from below. To build a physical string bit model for even , we should require .
We next study the dependence of on . Figure 5 plots the change of with respect to for chains of and . For , we sampled from 1 to ; for , only even points are sampled as its ground states only survive in even cases. For each , we choose . For , all the curves almost rise linearly. Of all four curves, is the steepest one, and is the flattest one. and almost coincide with each other. For the case, the overall trends of the curves are the same as except for slight oscillations between even and odd points. For , the oscillation is relatively noticeable, and for , it is negligible. Actually, if only even points of are sampled, the plots are almost the same as . The exponential dependence of on stems from the fact that each ground state has degeneracies. The fact that has a lower slope than others is also related to the fact that is the boundary for to be bounded from below.
7 Conclusion
We have presented a formalism to calculate the cubic interaction vertices for the stable string bit model. With the vertices, we calculated the one-loop self-energies of the model in both analytical and numerical ways.
From the large behavior of one-loop self-energies, we found that the Lorentz invariance requires the critical dimension of the model to be , which then leads to the protostring model. One interesting interpretation of is as follows[13]. Out of the 24 dimensions, 16 of them are paired to form 8 compactified bosonic dimensions, and the rest 8 remain as fermionic dimensions. Thus, it has the same degrees of freedom as the superstring model. The large behavior of is determined by the ground states contribution of the small chains. Notwithstanding that the number of excited states grows exponentially with respect to [10], the excited states contributions are canceled out due to the fermionic nature of string bits. These results support the idea of formulating string theory by string bit models.
The future research of this work can be done in several ways. One can improve the numerical computation to study higher or cases. One can also apply the formalism to other calculations, e.g., four strings interaction, or to study higher-loop corrections and find the Feynman rules of the model.
8 Acknowledgments
We thank Charles Thorn, Pierre Ramond, and Sourav Raha for helpful discussions and comments on this work. This research was supported in part by the Department of Energy under Grant No. DE-SC0010296.
Appendix A Hamiltonian and its action on color singlets
The (anti)communication relations among string bit creation and annihilation operators is
[TABLE]
where the sum runs over all permutations of .
The Hamiltonian of the model consists of terms and terms. The terms are the generalization of the Hamiltonian of the string bit model [8, 10]
[TABLE]
where and . produces the Green-Schwarz Hamiltonian [14, 15] at .
is generalized to , where[9, 11]
[TABLE]
One can check that for eq. (A.3) is reduced to eq. (A.2) if one identifies as and as .
We now add terms to the Hamiltonian. As refs. [10, 8] show, the behavior is not affected by the terms
[TABLE]
By analogy with , can be generalized to the arbitrary case as
[TABLE]
Combining the two parts together, we have the complete form of the Hamiltonian for arbitrary ,
[TABLE]
where is a real constant.
commutes with the supersymmetry operators
[TABLE]
[TABLE]
which will guarantee equal numbers of bosonic and fermionic eigenstates at each energy level.
Using the commutation relations (A.1), we obtain the action of on single trace states [11]
[TABLE]
[TABLE]
[TABLE]
[TABLE]
[TABLE]
Similarly, the action of on a single trace state is
[TABLE]
The actions of on double traces are [11]
[TABLE]
[TABLE]
Similarly, the action of on double traces is
[TABLE]
A.1 Derivation of
It is not obvious how to generalize to arbitrary cases. We actually obtain the generalization from the relation
[TABLE]
which has been proven in Appendix E of ref. [10] for . Here, the color operator is defined as [7]
[TABLE]
and both and are supersymmetric and of . The notation indicates the normal ordering of . In , we have[10]
[TABLE]
One can verify that the action of on any color singlet vanishes: . We therefore have in the color singlet space.
To find , we expand and match its terms with and . By direct calculation, we have
[TABLE]
We calculate each term on the rhs of and obtain
[TABLE]
[TABLE]
[TABLE]
[TABLE]
Combining the above together, we have
[TABLE]
Comparing the terms of with and , we can identify
[TABLE]
and as (A.6). One can verify that both and commute with the supersymmetry operators (A.8).
Appendix B Verifying the normalization condition
for
In this Appendix we show that the conjugate eigenfunction of , defined as eq. (39), satisfies the normalization condition (34). We first show that . For odd ,
[TABLE]
where in the last step we used666We do not prove the formula (B.1) here. But we have verified it by the Mathematica program.
[TABLE]
Similarly, we can show for even .
To show for , it suffices to show that vanishes for all and any eigenfunction . If , it clearly vanishes because both and contain the Grassmann odd operator . If ,
[TABLE]
The rhs of (B.2) vanishes because of
[TABLE]
which can be verified by checking that
[TABLE]
[TABLE]
Similarly, we can show that for . Therefore, the normalization condition is proved.
Appendix C Calculation of
In this Appendix, we will find the expression of in terms of lowering and raising operators. The in the language of is
[TABLE]
We now temporarily drop the last two constant terms and will add them back in the end of the calculation.
Using (13b), we express and in terms of and :
[TABLE]
Substituting the above into and rearranging, we obtain
[TABLE]
where are the terms with zero modes and are the terms without,
[TABLE]
[TABLE]
Let us first consider . We express nonzero modes and in terms of raising and lowering operators. Using
[TABLE]
we have
[TABLE]
We then apply eqs. (C.1) to , collect like terms, and antisymmetrize and terms to give
[TABLE]
where
[TABLE]
Similarly, applying
[TABLE]
[TABLE]
[TABLE]
[TABLE]
to yields
[TABLE]
where
[TABLE]
Now from eq. (C.3), we see that
[TABLE]
Hence, to add terms to , we can simply change the index of (C.2) to start from [math]. Finally, adding back the constant terms, we have
[TABLE]
where is given by (C.3) and
[TABLE]
Appendix D Calculation of
In this Appendix we will derive the formula
[TABLE]
where and , and the relations among , , and are given by
[TABLE]
with .
Let , ; then
[TABLE]
Now let us calculate each term in the parentheses of the rhs of eq. (D.3). For the first term
[TABLE]
It follows that the higher order commutations all vanish. Substituting eqs. (D.4) into eq. (D.3), we have
[TABLE]
where in the third equality we antisymmetrized the term to be and then used the fact that and are antisymmetric matrices. Now,
[TABLE]
where in the second-to-last equality follows from eqs. (28) and (32). We therefore have
[TABLE]
which implies (D.1).
Appendix E Examples of
In this Appendix, as a demo of using (58) to calculate one-loop self-energy, let us consider the one-loop self-energy for the ground state of the and cases. For , we only need to calculate the case since the contribution of is the same as .
The , , and matrices are
[TABLE]
and matrices , , and constant are
[TABLE]
The operators are
[TABLE]
For , the eigenfunctions and their conjugates of -bit and -bit chains are shown in Table 2.
The contribution of to the energy correction is
[TABLE]
So, we need to calculate and :
[TABLE]
[TABLE]
Likewise,
[TABLE]
Substituting above results and into (E.1) yields . We then have
[TABLE]
For , the matrices and constants are the same as the case. But as Table 3 shows, the energy eigenstates of small chains are different. The energy correction now is given by
[TABLE]
Since we have calculated the and in the case, we only need to find and .
For ,
[TABLE]
[TABLE]
Likewise
[TABLE]
Substituting the above into eq. (E.2), we obtain
[TABLE]
From the results and the formula (58), we see that is a polynomial of of degree .
The reference list from the paper itself. Each links out to its DOI / PubMed record.
- 1[1] C. B. Thorn. Reformulating string theory with the 1/N expansion. In The First International A.D. Sakharov Conference on Physics Moscow, USSR, May 27-31, 1991 , 1991.
- 2[2] G. βt Hooft. On the Quantization of Space and Time. In V.A. Berezin Eds. M.A. Markov and V.P. Frolov, editors, Proc. of the 4th Seminar on Quantum Gravity, May 25-29, 1987, Moscow, USSR. , pages 551β567. World Scientific Press, 1988.
- 3[3] G. βt Hooft. Quantization of Discrete Deterministic Theories by Hilbert Space Extension. Nucl. Phys. , B 342:471β485, 1990.
- 4[4] G. βt Hooft. Dimensional reduction in quantum gravity. In Salamfest 1993:0284-296 , pages 0284β296, 1993.
- 5[5] G. βt Hooft. A Planar Diagram Theory for Strong Interactions. Nucl. Phys. , B 72:461, 1974.
- 6[6] C. B. Thorn. A Fock Space Description of the 1/ N c subscript π π N_{c} Expansion of Quantum Chromodynamics. Phys. Rev. , D 20:1435, 1979.
- 7[7] O. Bergman and C. B. Thorn. String bit models for superstring. Phys. Rev. , D 52:5980β5996, 1995.
- 8[8] S. Sun and C. B. Thorn. Stable String Bit Models. Phys. Rev. , D 89(10):105002, 2014.
