First results of the new endcap TOF commissioning at BESIII
Zhi Wu, Shengsen Sun, Yuekun Heng, Xiaozhuang Wang, Yongjie Sun, Cheng, Li, Hongliang Dai, Ping Cao, Jie Zhang, Weijia Sun, Siyu Wang, Yun Wang,, Xiaolu Ji, Jinzhou Zhao, Wenxuan Gong, Mei Ye, Xiaoyan Ma, Mingming Chen,, Meihang Xu, Xiaolan Luo, Rongxing Yang, Qi An

TL;DR
This paper reports the initial commissioning results of the upgraded endcap Time-of-Flight system at BESIII, utilizing Multi-gap Resistive Plate Chamber technology to enhance particle detection capabilities.
Contribution
It presents the first commissioning results of the new MRPC-based endcap TOF system at BESIII after installation.
Findings
Successful installation completed in October 2015
Initial performance metrics of the MRPCs are promising
The upgrade improves timing resolution and detection efficiency
Abstract
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
