The upgrade system of BESIII ETOF with MRPC technology
Xiaozhuang Wang, Yongjie Sun, Cheng Li, Yuekun Heng, Zhi Wu, Ping Cao,, Hongliang Dai, Xiaolu Ji, Wenxuan Gong, Zhen Liu, Xiaolan Luo, Weijia Sun,, Siyu Wang, Yun Wang, Rongxing Yang, Mei Ye, Jinzhou Zhao

TL;DR
This paper discusses the upgrade of the BESIII ETOF system using MRPC technology to achieve better timing resolution and particle identification, including design, testing, and performance validation.
Contribution
The paper presents the design, construction, and testing of a new MRPC-based ETOF system for BESIII, demonstrating its performance meets upgrade requirements.
Findings
System achieves better than 80 ps timing resolution
Successful integration of MRPC modules with electronics
System passes performance tests with cosmic rays
Abstract
The Beijing Spectrometer III (BESIII) endcap Time-Of-Filght (ETOF) was proposed to upgrade with Multigap Resistive Plate Chamber (MRPC) technology to substitute the current ETOF of scintillator+PMT for extending time resolutin better than 80 ps and enhance the particle identification capability to satisfy the higher precision requirement of physics. The ETOF system including MRPC modules, front end electronics (FEE), CLOCK module, fast control boards and time to digital modules (TDIG), has been designed, constructed and done some experimental tests seperately. Aiming at examining the quality of entire ETOF system and training the operation of all participated parts, a cosmic ray test system was built at the laboratory and underwent about three months to guarantee performance. In this paper the results will be presented indicating that the entire ETOF system works well and satisfies the…
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
