Transport from the Recycler Ring to the Antiproton Source Beamlines
M. Xiao (Fermilab)

TL;DR
This paper presents the conceptual design of a new beamline that transports 8 GeV protons from the Recycler Ring to the Antiproton Source beamlines, enabling delivery to experiments without new civil construction.
Contribution
It introduces a novel transfer line design connecting the Recycler Ring to the existing beamlines for efficient proton delivery.
Findings
Design successfully integrates with existing infrastructure
Allows proton transfer without additional civil construction
Supports Mu2e and g-2 experimental needs
Abstract
In the post-Nova era, the protons are directly transported from the Booster ring to the Recycler ring rather than the Main Injector. For Mu2e and g-2 project, the Debuncher ring will be modified into a Delivery ring to deliver the protons to both Mu2e and g-2 experiemnts. Therefore, It requires the transport of protons from the Recycler Ring to the Delivery ring. A new transfer line from the Recycler ring to the P1 beamline will be constructed to transport proton beam from the Recycler Ring to existing Antiproton Source beamlines. This new beamline provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. This paper presents the Conceptual Design of this new beamline.
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsParticle accelerators and beam dynamics · Particle Accelerators and Free-Electron Lasers · Muon and positron interactions and applications
