Latest Beam Test Results of the FONT4 ILC Intra-train Feedback System Prototype
P.N. Burrows, R. Apsimon, G.B. Christian, C. Clarke, B. Constance,, H.Dabiri Khah, T. Hartin, A. Kalinin, C. Perry, J. Resta Lopez, C. Swinson

TL;DR
This paper reports on the design, implementation, and preliminary testing of a prototype digital feedback system for the ILC, demonstrating a latency of about 140 ns in a test environment.
Contribution
It introduces a new prototype feedback system with custom hardware components and provides initial performance measurements for the ILC application.
Findings
Latency of approximately 140 ns achieved
Successful testing on KEK ATF extraction line
Prototype components function as intended
Abstract
We present the design and preliminary results of a prototype beam-based digital feedback system for the Interaction Point of the International Linear Collider. A custom analogue front-end processor, FPGA-based digital signal processing board, and kicker drive amplifier have been designed, built, and tested on the extraction line of the KEK Accelerator Test Facility (ATF). The system was measured to have a latency of approximately 140 ns.
Peer Reviews
No public reviews on file for this paper yet. If you reviewed it on a platform where reviews are public (OpenReview, ICLR, NeurIPS, ICML), you can paste yours below so the community can read it here.
Videos
No videos yet. Explain this paper in a talk, walkthrough, or lecture? Add one.
Taxonomy
TopicsGyrotron and Vacuum Electronics Research · Particle Accelerators and Free-Electron Lasers · Particle accelerators and beam dynamics
